Laserfiche WebLink
PUBLICEINORKS PERMIT •ateApplied: 5/3/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2205-006 <br /> EVERETT 3200 Cedar Street, 2nd 0 Floor Associated Bldg Permit#: <br /> Everett, WA 9821 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $85.00 <br /> OWNER NAME AND ADDRESS: NO FINAL PPLICANT NAME AND ADDRESS: <br /> APPROVAL <br /> SHEELER JACK :ERNARD DUMYAHN <br /> 8919 EASTVIEW AVE JUN 20 2023 <br /> EVERETT,WA,98208 <br /> PHONE: ARCHIVED 'HONE:8152521667 <br /> TAX PARCEL ID#:005760032000r ITE ADDRESS:2408 39TH ST <br /> DESCRIPTION: INSTALLING(2)4" PVC CONDUITS TO EXTG COMMUNICATION FACILITY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. All work including Traffic Control must be done in accordance with MUTCD Standards and the attached plans approved by City of Everett. <br /> 5. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 6.Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614,or as directed by the City PW Inspector. <br /> Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 7. Full lane width grind and overlay is required for trenches greater than 100'in length,multiple cuts within a 100' length section,and/or as <br /> directed by the City PW Inspector. <br /> 8. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 9. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections. Inspections are required for job start notification, potholing all City utilities,evaluation of traffic control set-up,to view <br /> the work prior to backfill,and after final restoration to final the permit. Request a final inspection online by selecting PW 25-Site Final/Permit <br /> Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 10. Potholing required for all crossings over/under City of Everett water mains. <br /> 11. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 12.Noise from temporary construction sites is not allowed 10:00PM—7:00AM weekdays,6:00PM—8:00AM weekends unless a variance has <br /> been issued.Construction projects wishing a variance from the noise ordinance must submit an application at least 30 days prior to <br /> commencing work. Please visit the following website for more information https://everettwa.gov/1545/Noise-Administration <br /> Public Works Permit Fee Breakdown: - ^ � L1.1Cut/Bore Alley/Pavement(Non-Parallel)(5 LF) $45.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 MAY 0 5 2022 <br /> CITY OF EVERETT <br /> City of Everett Official Use Only letaktHafifitiaggirtlT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> 5/3/2o improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> _APPLICANT/JOB SITE COPY TREASURERADDRESS FILE <br />