Laserfiche WebLink
i VERETT <br /> WASHINGTON PermitCity InsofEverettp ections <br /> BLDG 05- CORRECTION <br /> 3/23/2022 3/23/2022 UNDERFLOOR KURT KECK REQUIRED See notes <br /> FRAMING <br /> Notes: <br /> 3/22/2022 5:39 PM Charlie Apel <br /> AM inspection if possible and if needed.Photos emailed to Kurt Keck. <br /> Contact Name:Charlie Apel <br /> Site Address:1818 HOLBROOK AVE UNIT B <br /> Phone:4255917154 <br /> e-Mail:charlie@gatheredhouse.com <br /> (3/23/2022 2:46 PM KMK) <br /> Re new dining area: <br /> Floor joists need more support on house side of dining area. <br /> Also needs vapor barrier and ventilation. <br /> 3/24/2022 3/24/2022 BLDG 01 RAKEEB KHAN OTHER See notes <br /> CONSULTATION <br /> Notes: <br /> 3/22/2022 5:34 PM Charlie Apel <br /> PM inspecition if possible.Downstairs framing so that plumbing and electrical can proceed. <br /> Contact Name:Charlie Apel <br /> Site Address:1818 HOLBROOK AVE UNIT B <br /> Phone:4255917154 <br /> e-Mail:charlie@gatheredhouse.com <br /> (Canceled-eTRAKiT-3/23/2022 2:15:40 PM) <br /> (3/24/2022 3:59 PM RFK) <br /> Spoke with contractor regarding framing. 1.Engineer letter required for infill of fireplace in lieu of new beams as specified on the plans. <br /> 2.Engineering calculations required for floor framing at supports for LVL beam. <br /> 3.Provide squash block between floor joists where required at support locations. <br /> 4.Provide pictures of existing footing for support of new beam near stairway. <br /> 4/20/2022 4/20/2022 BLDG 08-FRAMING KURT KECK CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 4/15/2022 11:18 AM Charlie Apel <br /> Contact Name:Charlie Apel <br /> Site Address:1818 HOLBROOK AVE UNIT B <br /> Phone:4255917154 <br /> e-Mail:charlie@gatheredhouse.com <br /> (4/20/2022 4:19 PM KMK) <br /> 1.Verify with you mechanical inspector that all mechanical and electrical from previous contractor has been inspected and approved. <br /> 2.Fire block and air seal at top of walls and 10 feet horizontal as discussed <br /> Do not insulate. <br /> Reschedule for fire blocking inspection when ready <br /> -- \l <br /> Printed: Monday, 17 July,2023 (2Of3 rA <br /> SUPERION <br />