My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 59TH ST SW 2023-07-31
>
Address Records
>
59TH ST SW
>
2702
>
2702 59TH ST SW 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 1:25:50 PM
Creation date
7/31/2023 1:25:37 PM
Metadata
Fields
Template:
Address Document
Street Name
59TH ST SW
Street Number
2702
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WC <br /> 11411 <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2302-010 Description: EMERGENCY UNDERPINNING OF SE AREA AT RISK ACTIVE <br /> LANDSLIDE <br /> Applied:2/4/2023 Approved:2/23/2023 Site Address:2702 59TH ST SW <br /> Issued:2/23/2023 Finaled:5/10/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:ALEX RINALDI <br /> Parent Permit: Owner: MILLER DENNIS WADE&CHELSEA CARROLL ANN <br /> Parent Project: Contractor:ADVANCED FNDTN SUPPORTS LLC <br /> Details: <br /> RISK OF UNDERMINING DUE TO ACTIVE LANDSLIDE <br /> ea <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> BLDG 15-OTHER BLDG INSPECTOR eTRAKiT Inspection Request <br /> Notes: <br /> 3/23/2023 12:53 PM Chelsea Miller <br /> Contact Name:Chelsea Miller <br /> Site Address:2702 59TH ST SW <br /> Phone:4438459890 <br /> e-Mail:c_hordo@hotmail.com <br /> CORRECTION <br /> 3/31/2023 3/31/2023 BLDG 15-OTHER RAKEEB KHAN REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 3/23/2023 12:56 PM Chelsea Miller <br /> Contact Name:Chelsea Miller <br /> Site Address:2702 59TH ST SW <br /> Phone:4438459890 <br /> e-Mail:c_hordo@hotmail.com <br /> Upload special inspection report for installation of pin piles per drawings.Reschedule for final inspection once report is uploaded <br /> 5/9/2023 5/9/2023 SPECIAL RAKEEB KHAN ACCEPTED <br /> INSPECTION <br /> Notes: <br /> See attachment <br /> Printed:Wednesday, 10 May,2023 1 of 2 0' <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.