Laserfiche WebLink
1:11 <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/8/2022 12/8/2022 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 12/6/2022 7:48 AM Justin Totten <br /> Contact Name:Justin Totten <br /> Site Address:323 75TH ST SE BLDG C <br /> Phone:2066403235 <br /> e-Mail:justin.totten@chartercon.com <br /> Revisions to the drawings and plan review required.It appears the deck guards are not installed per the drawings and are surface mounted.Unable to <br /> verify spacing from wall to guard.Should be less than 4".See attached pictures. <br /> Note that the guards,connections,and structural framing supporting the guards should be designed for a 200-pound load applied in any direction <br /> 4/21/2023 4/21/2023 BLDG 16-FINAL KURT KECK CORRECTION <br /> REQUIRED <br /> Notes: <br /> 206-640-3235 <br /> JUSTIN.TOTTEN@CHARTERCON.COM <br /> Spoke with contractor on site on Wednesday.Framing was scheduled and inspected only on initial units.Work done on the initial units was approved. <br /> Contractor explained that all units were done by the same standard of the initial inspections.However,as they were not inspected,verification needs to <br /> be provided that the guardrails meet the minimum code of 200 lbs of resistance as expressed by inspector Rakeeb. <br /> Please provide engineer approval of attached RFI <br /> 4/27/2023 4/27/2023 BLDG 16-FINAL BLDG INSPECTOR APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> Approval per engineers letter.See attached <br /> Printed: Friday,28 April,2023 2 of 2 ° <br /> SUPERION <br />