Laserfiche WebLink
Drew Martin <br /> From: Drew Martin <br /> Sent: Tuesday, February 2, 2021 12:21 PM <br /> To: Philip Gerou <br /> Cc: Alex Byrd <br /> Subject: City of Everett Permit Services: 1130 75th Street SE (B2012-015) - First Intake Building <br /> Review <br /> Attachments: City of Everett - Small Home Project Guidelines.pdf; General Code Requirements.docx <br /> Hello Mr. Gerou, <br /> Your application has been received and a permit set up. However, the submitted documents are not sufficient <br /> for us to perform a review at this time. Construction-level documents need to be submitted for <br /> review. Information is attached to provide guidance. Preliminary comments are provided below to assist in <br /> preparing the drawings, but these are not intended to provide a comprehensive review. Depending on your <br /> experience with the model codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> 1. The submitted documents generally appear to include only sketch-level drawings for the existing and <br /> proposed building; the drawings do not delineate between the existing and proposed <br /> condition. Construction-level drawings should be submitted for review. The drawings should be to- <br /> scale (minimum 1/4"=1'-0") and drawn using standard drafting conventions. The drawings should <br /> include building sections, details, etc. <br /> 2. The plans appear to show the basement as finished. The available City of Everett and Snohomish <br /> County records do not indicate that the basement is finished. The basement will need to comply with <br /> current code requirements. Portions that do not comply will need to be returned to an unfinished <br /> conditions and identified accordingly on the plans. <br /> 3. Structural framing plans may be required depending on the scope of work. Where structural <br /> modifications will affect the existing systems,the existing systems must be specified (e.g., framing <br /> sizes, spacing, and spans, etc.). Structural sections, details, general notes, and material requirements <br /> should be included. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> am <br /> aii Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2"d Floor, Everett,WA 98201 <br /> EVERETT Hours: M/W/Th/F: 7:30am-12:OOpm & 1:00pm-3:00pm;Tu: 1:OOpm-3:OOpm <br /> everettwa.gov I Facebook I Twitter <br /> COVID-19 Update: Please reference our website& online resources for updates to our service during the <br /> COVID-19 pandemic. We are currently experiencing a higher volume of calls and emails and have limited staff <br /> available to respond. Your patience is appreciated as we respond in the order received. <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />