Laserfiche WebLink
'Hello Drew, <br /> From the email you sent, were the documents I provided on March 23 worked on by Steve Hull not construction level <br /> drawings, or are those documents missing?Or from the March documents are additional construction-level drawings <br /> needed? <br /> ij <br /> I just want to get that clarified so I can get you exactly what you need as soon as possible. <br /> Thanks <br /> On Wed, May 26,2021 at 2:36 PM Drew Martin<dmartin@everettwa.gov>wrote: <br /> Hello, Philip. <br /> I am the Building reviewer for this project. Intake reviews for this project were performed by Building and Planning <br /> on 02/02/2021 and corrections issued via email. I have reattached those emails for your convenience. I am also <br /> attaching documents previously provided in the Building email. <br /> We have not received revised construction-level drawings addressing the review comments. Note that the intake <br /> reviews are not comprehensive first reviews. First reviews will be performed once drawings satisfying the submittal <br /> requirements have been received. The project will be reviewed in the order received. Additional comments may be <br /> issued pending review of the construction-level drawings. <br /> ffaFfilEz• Drew Martin, P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2 n d Floor, Everett,WA 98201 <br /> Hours: M/W/Th/F: 7:30am-12:00pm & 1:OOpm-3:OOpm;Tu: 1:00pm-3:00pm <br /> everettwa.gov I Facebook I Twitter <br /> ail <br /> 3 LI <br />