My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 75TH ST SE 2023-08-08
>
Address Records
>
75TH ST SE
>
1130
>
1130 75TH ST SE 2023-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:41:11 PM
Creation date
7/31/2023 2:52:18 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1130
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r• It <br /> Mil <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2012-015 Description: REMOVE&REPL SHEETROCK,INSULATION,OVERALL <br /> REMODEL SFR, <br /> Applied: 12/12/2020 Approved:8/18/2021 Site Address: 1130 75TH ST SE <br /> Issued:8/19/2021 Finaled:5/8/2023 City,State Zip Code: EVERETT,WA <br /> Status: FINALED Applicant:GEROU PHILIP <br /> Parent Permit: Owner:GEROU PHILIP <br /> Parent Project: Contractor:OWNER <br /> Details: <br /> MOVE BATHROOM AND ADD 1/2 BATH ON MAIN FLOOR.MAKE BASEMENT HABITABLE W/BEDROOM AND BATHROOM. <br /> REMOVE&REPL SHEETROCK,INSULATION,OVERALL REMODEL SFR, <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 3/1/2022 3/1/2022 PERMIT EXTENSION KURT KECK OTHER Work in progress <br /> Notes: <br /> 2/28/2022 10:42 AM Philip Gerou <br /> Contact Name:Philip M Gerou <br /> Site Address:1130 75th St SE <br /> Phone:4252631077 <br /> e-Mail:gerou.philip@gmail.com <br /> 3/16/2022 3/16/2022 BLDG 08-FRAMING KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 3/14/2022 8:24 PM Philip Gerou <br /> Contact Name:Philip M Gerou <br /> Site Address:1130 75th St SE <br /> Phone:4252631077 <br /> e-Mail:gerou.philip@gmail.com <br /> (3/16/2022 11:44 AM KMK) <br /> Complete mechanical and electrical rough in inspections. <br /> Reschedule for framing when above is complete. <br /> Note:spoke with contractor this morning regarding inspection process. <br /> A site visit will be necessary at next framing inspection. <br /> Printed: Monday,08 May,2023 1 of 3 r4 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.