My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 75TH ST SE 2023-08-08
>
Address Records
>
75TH ST SE
>
1130
>
1130 75TH ST SE 2023-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:41:11 PM
Creation date
7/31/2023 2:52:18 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1130
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/10,1022 Page 1 <br /> City of Everett <br /> 6:37:15AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2112-135 • <br /> Site Address 1130 75TH ST SE <br /> Applied 12/20/2021 Applicant Dave Meyers Lot <br /> Approved 12/20/2021 Owner GEROU PHILIP Block <br /> Issued 12/20/2021 Contractor D&L ELECTRIC LLC Tract <br /> Parent Permit No. B2012-015 Description Complete rewire <br /> Notes New service and branch circuits <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 12/27/2021 12/27/2021 ELEC 05-SERVICE SKB NO ACCESS eTRAKiT Inspection 12/23/2021 2:46 PM Dave Meyers <br /> Request <br /> Contact Name:Dave Meyers <br /> Site Address: 1130 75TH ST SE <br /> Phone:3606182461 <br /> e-Mail:daveselectric87@gmail.vom <br /> 12/28/2021 12/28/2021 ELEC 05-SERVICE SKB APPROVAL as noted (12/27/2021 8:44 AM SKB) <br /> Contact Name:Dave Meyers <br /> Site Address: 1130 75TH ST SE <br /> Phone:3606182461 <br /> e-Mail:daveselectric87@gmail.vom <br /> (12/28/2021 12:00 PM SKB) <br /> Contactor is installing installing covers on <br /> service entrance connections above breaker. <br /> Check acorn clamps as they were buried <br /> under snow and emergency disconnect label <br /> at final. <br /> 3/2/2022 3/2/2022 ELEC 06-ROUGH SKB NOT READY eTRAKiT Inspection 3/1/2022 6:29 PM Dave Meyers <br /> IN Request <br /> Contact Name:Dave Meyers <br /> Site Address: 1130 75TH ST SE <br /> Phone:3606182461 <br /> e-Mail:daveselectric87@gmail.com <br /> (3/2/2022 2:25 PM SKB) <br /> Finish framing get plumbing approved <br /> install the gas system bond the gas Get the <br /> gas system approved.Install the mechanical <br /> system get the mechanical system approved <br /> prior to electrical inspection.Not ready. <br /> 5/26/2022 5/26/2022 ELEC 06-ROUGH SKB APPROVAL eTRAKiT Inspection 5/25/2022 2:44 PM Dave Meyers <br /> IN Request <br /> Contact Name:Dave Meyers <br /> Site Address: 1130 75TH ST SE <br /> Phone:3606182461 <br /> e-Mail:daveselectric87@gmail.com <br /> 8/8/2022 8/8/2022 ELEC 10-FINAL SKB CORRECTION eTRAKiT Inspection 8/7/2022 1:45 PM Dave Meyers <br /> Request <br /> Contact Name:Dave Meyers <br /> Site Address: 1130 75TH ST SE <br /> Phone:3606182461 <br /> e-Mail:daveselectric87@gmail.com <br /> (8/8/2022 1:16 PM SKB) <br /> Provide GFCI protection for all bathroom <br /> receptacles especially for the towel warmer <br /> and all basement receptacles on the <br /> unfinished floor. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.