My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1524 W MUKILTEO BLVD 2023-07-31
>
Address Records
>
W MUKILTEO BLVD
>
1524
>
1524 W MUKILTEO BLVD 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 4:13:17 PM
Creation date
7/31/2023 2:55:06 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1524
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 AWN 12Z-o81 <br />EVERETT <br />WASHI NGTON <br />CITY OF EVERETT <br />Community, Planning & Economic Development Department <br />Planning Division <br />ACCESSORY DWELLING UNIT CHECKLIST <br />INSTRUCTIONS 4 Submit this checklist with either your building permit application (Review <br />Process I), or with your Accessory Dwelling Unit (Review Process II) application, in order to apply <br />for an attached or detached ADU. The proposal must meet Everett Municipal Code 19.08.100, <br />Accessory Dwelling Units and any other applicable zoning regulations. Note: This checklist only <br />addresses zoning code regulations for ADUs and does not address building code or other site <br />development codes. <br />l Fees. See current Fee Schedule for Review Process I or II. <br />This fee does not include building permit fees or system <br />development fees. Please speak with a Permit Technician at 425- <br />257-8810 opt 8 to understand all fees involved to add an ADU to <br />your property. <br />Column to be completed by <br />Applicant .l <br />Total Fee: <br />$604 <br />2)❑✓ Where are ADUs Permitted? Zone of Property: R-1 <br />An ADU shall be permitted as an accessory use to the principal Historic Overlay: <br />dwelling unit in the zones indicated in EMC 19.05, Use Table #5-1 on <br />any legally established lot. <br />3) ✓�Is your application a Review Process I or 11? <br />Review Process 1. An ADU will be processed with your building <br />permit application if no modification of the design standards is <br />requested. <br />Review Process ll. If requesting a modification from the design <br />standards listed below, the application shall be processed as a <br />Review Process II. (See #13) <br />❑Single-family: more than one entrance on any street side <br />2930 Wetmore Ave, Ste 8-A O 425.257.8731 <br />Everett, WA 98201 425.257.8742 fax <br />Check one: <br />LaCeview Process I. Complete this <br />checklist and include it with your <br />building permit submittal. <br />planning@everettwa.gov <br />everettwa.gov U/10 <br />Updated April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.