My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW SNO CO PUD 2023-08-08
>
Address Records
>
75TH ST SW
>
1122
>
SNO CO PUD
>
1122 75TH ST SW SNO CO PUD 2023-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:58:06 PM
Creation date
7/31/2023 3:45:32 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Tenant Name
SNO CO PUD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />Project Description <br />This project involves a new Connect Up program that will replace all electrical and water <br />meters with smart electronic meters by Snohomish County PUD. This phase of the project will <br />provide receiving, warehousing, and distribution of residential, commercial, and water meters <br />at (3) district sites. This signed structural calculation package includes project elements <br />designed for the 75th Street Business Center site. Structural design will be provided for new <br />steel framing to repair an existing hole in the existing mezzanine slab. An existing CMU shear <br />wall is being reduced in length by approximately 4 feet. Calculations will be provided to verify <br />the lateral capacity of the wall for in plane and out of plane lateral loads. A new steel lintel will <br />be designed for the widened opening. Anchorage will be designed for existing light gauge stud <br />walls to tie them to the existing ceiling. <br />Scope of Work <br />We will provide stamped structural calculations and construction drawings suitable for permit <br />and construction. <br />Basis of Design <br />Roof Dead 15 psf <br />Live 25 psf (snow) <br />Mezzanine Dead 40.7 psf <br />Live 125 psf (light storage) <br />CU Wall Dead 84 psf (fully grouted) <br />Seismic Parameters <br />V = Wp*[Sds/(R/le)] = Sds/(6.5/1) = Cs*Wp <br />Sds 0.913 <br />R 5.0 (special reinforced masonry shear wall) <br />Importance Factor, le 1 (Non -Essential Facility) <br />Wp = Seismic Dead Weight of Structure <br />Description By JDM Date 3 4 2022 <br />Project Summary Checked Date <br />ENGINEERING Scale NTS Sheet No. <br />250 4th Ave South project Job No. <br />EdmoSuit 20 98020 PUD 75th St Business Center 21352.10ds, 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.