Laserfiche WebLink
Iri <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3 notes from framing complete.Special inspection provided for holdowns.See attached report. Insulation in floor and attic verified. Need all sub <br /> permits final approved for final building approval.Note entry stair are existing. Reschedule building final when ready. <br /> 5/24/2023 5/24/2023 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> 3 notes from framing complete.Special inspection provided for holdowns.See attached report.Insulation in floor and attic verified. <br /> Note entry stairs are existing. <br /> 5/25/2023 CERTIFICATE OF Permit Technician <br /> OCCUPANCY <br /> Notes: <br /> si <br /> Printed:Thursday,25 May,2023 3 of 3 SUPERION <br />