My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
412 58TH ST SE 2023-08-01
>
Address Records
>
58TH ST SE
>
412
>
412 58TH ST SE 2023-08-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 2:23:38 PM
Creation date
8/1/2023 12:03:46 PM
Metadata
Fields
Template:
Address Document
Street Name
58TH ST SE
Street Number
412
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI1/ORKS PERMIT Date Applied: 5/31/2019 <br /> City of Everett Permit Services Public orks Permit#: PW1906-001 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETTEverett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $274.22 <br /> 8 JUN 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WARNER RAYMOND L&JEANINE M WARNER RAYMOND L&JEANINE M <br /> 412 58TH ST SE 412 58TH ST SE <br /> EVERETT,WA,98203-3547 EVERETT,WA,98203-3547 <br /> PHONE:4257607151 PHONE:4257607151 <br /> TAX PARCEL ID#:00471700002602 SITE ADDRESS:412 58TH ST SE <br /> DESCRIPTION:ASPHALT/CONCRETE PAVING AND RETAINING WALL <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site work to be done per plans approved by the City of Everett Public Works Department dated 06/12/2019.Approved plans must <br /> remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards. Remove upon completion of the project prior to final <br /> approval of the permit. , <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. _ y , H ;•a"") <br /> 8. Protect all existing underground utilities during construction. _i�� T, --1 • <br /> 9. This wall and all work constructed within the public right-of-way must be removed or reloca �tR�,n 'axpefie if the City <br /> ever requires use of the right-of-way for municipal purposes. c' c '_` <br /> 10. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as di cted by the <br /> City PW Inspector. ''' RR <br /> al <br /> 11.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection ctrrti by <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for this permit fen all items have been cometed. <br /> Public Works Permit Fee Breakdown: .=4,4. _ <br /> Concrete Patio Paving $45.00 I y + ; <br /> Retaining wall in the ROW $40.00 8, � <br /> c-D <br /> PW Plan Review $20.00 LT, <br /> PW Site Inspection $20.00 r- <br /> Stormwater System Development Fee $149.22 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> 1 i /Z/tz p causes of action that may arise because of installation and maintenance of <br /> !i <br /> Approved for Construction (Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> � f✓� CO r° <br />
The URL can be used to link to this page
Your browser does not support the video tag.