Laserfiche WebLink
I <br /> I <br /> Gravity Design Loads <br /> I Roof DL <br /> Roofing Material 2.5 psf <br /> 1/2 Sheathing 1.4 psf <br /> 15/8 Gypsum 2.8 psf <br /> (2)2x6 @ 24"OC 2.3 psf <br /> Misc 1.0 psf <br /> I 10.0 psf <br /> USE 10.0 psf <br /> I Exist Walkway DL <br /> Flooring Material 2.0 psf <br /> 3/4 Sheathing 2.3 psf <br /> 1 5/8 Gypsum 2.8 psf <br /> 2x12 @ 16"OC 3.5 psf <br /> M/E 1.0 psf <br /> IMisc 1.5 psf <br /> 13.1 psf <br /> USE 15.0 psf <br /> I <br /> Stair DL <br /> I <br /> 2.5" Precast Concrete 32.0 psf <br /> Treads <br /> I Intermediate Landing DL <br /> 3"Concrete Slab 38.0 psf <br /> IStair/Walkway LL 100.0 psf <br /> IRoof LL(Snow) 25.0 psf <br /> I <br /> I <br /> 0 � Description ByCh Date <br /> Gravity Design Loads ERH 10/01/21 <br /> Checked Date <br /> ENGINEERING Scale Sheet No. <br /> III 250 4th Ave.South Project <br /> Suite 200 River's Landing Apartments Job No. <br /> Edmonds,WA 98020 21322.10 <br /> I 2 <br />