My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2654
>
Ordinances
>
Ordinance 2654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 2:35:01 PM
Creation date
8/4/2023 2:34:54 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2654
Date
8/21/1935
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ORDINANCE NO. 2654 <br /> An Ordinance providing for the construction <br /> and laying of a pipe line of suitable capacity, and the <br /> furnishing and installation of appurtenances necessary to <br /> conduct water from Reservoir No. 2 of the water system of <br /> the City of Everett to the Pulp Mill of the Weyerhaueser <br /> Timber Company, located in said City; providing for the <br /> calling for bids for said wor* and the payment thereof. <br /> WHEREAS, the City of Everett has heretofore <br /> entered into a contract with the Weyerhauese.r Timber Company <br /> for the sale of surplus water from its municipal supply <br /> system for use in the Pulp Mill of said Timber Company, <br /> and in order to deliver said water to said pulp mill it <br /> is necessary to construct a service pipe from Reservoir <br /> No. 2 of the City of Everett to the Pulp Mill of said <br /> Timber Company. <br /> AND WHEREAS, the ground where said service pipe <br /> line is to be laid is low and swampy, and it is essential <br /> that the same be constructed before the rainy season sets in; <br /> AND WHEREAS, it is of great advantage to said <br /> City to carry out said contract for the sale of surplus <br /> water to said Timber Company; NOW, THEREFORE, <br /> THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: That there be constructed by the City <br /> of Everett a pipe line of suitable capacity, together with <br /> all necessary appurtenances to conduct and deliver water from <br /> Reservoir No. 2 of the City water system through the filtering <br /> plant of the 1+eyerhaueser Timber Company to Its Pulp Mill, all <br /> in accordance with the plans and specifications heretofore <br /> prepared for said work by the City Engineer, which said plans <br /> and specifications are hereby adopted. <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.