Laserfiche WebLink
GROUNDING NOTES (L)PGEESERVICE <br /> A <br /> I. ALL DETAILS ARE SHOWN IN GENERAL TERMS.ACTUAL GROUNDING INSTALLATION AND <br /> 61 <br /> CONSTRUCTION MAY VARY DUE TO SPIE SPECIFIC CONDITIONS. <br /> M <br /> INSTALL MOUNTING PIPE OH') <br /> 2. GROUND ALL ANTENNA BASES,FRAMES,CABLE RUNS,AND OTHER MfTAWC COMPONENTS "g' NEMA 3R,200A, <br /> II SYMBOL LEGEND <br /> USING#2 GROUND WIRES AND CONNECT TO SURFACE MOUNTED GROUND BUS BARS AS 240/120V,10,3W, ■D(OTHLT � �� • <br /> SHOWN.FOLLOW ANTENNA AND BT5 MANUFACTURERS PRACTICES FOR GROUNDING 14kAIC METER/MAIN, , <br /> REQUIREMENTS.GROUND COAX SHIELD AT BOTH ENDS USING MANUFACTURERS PRACTICES. g SERVICE ENTRANCE RATED PAN ELBOARD INSTALL ANTENNA(IYP) — N A MECHANICAL CONNECTION <br /> AU.UNDERGROUND WATER PIPES,METAL CONDUITS AND GROUNDS THAT ARE A PART Of T115 G G <br /> SYSTEM SHALL Be BONDED TOGETHER VOLTS: 240/120V,10,3W BUS AMPS:200A <br /> SC LEVEL: I OkAIC MAIN CB: 200A '3' N g CL <br /> 3. ALL GROUND CONNECTIONS SHALL Be#2 AWG U.N.O.ALL WIRES SHALL BE COPPER THHWITIWN. - w <br /> ALL GROUND WARE SHALL Be SOLID TIN COATED OR STRANDED GREEN INSULATED WIRE. 0LOAD DESCRIPTION AMPBKR/ CIRCUIT BKR <br /> NO AMP/ LOAD DESCRIPTION INSTALL RRH(1W) I--- , <br /> 4. CONTRACTOR TO VERIFY AND TEST GROUND TO SOURCE,5 OHMS MAXIMUM.PROVIDE POLE POLEi ID <br /> SUPPLEMENT GROUNDING RODS AS REQUIRED EVE TO ACHISPECIFIED OHMS READING. 01 02 20/1 LIGHTS i <br /> GROUNDING AND OTHER OPTIONAL TESTING WILL BE WITNESSED BY THE WARM SCAB 100/2 <br /> REPRESENTATIVE. 03 04 20/1 PLUG JUMPER CABLES(117'1 <br /> SCAB S/2 05 OG SPACE <br /> 5. NOTIFY ARCHITECTIT3NGINEER IF THERE ARE AlY DIFFICULTIES INSTAWNG GROUNDING SYSTEM N 07 08 SPACE O `BER A DC CABLES(11?) • ` ' § <br /> DUE TO SITE SOIL CONDRIONS. SPACE 09 10 SPACE <br /> G. BARE GROUNDING CONDUCTOR SHALL Be HARD DRAWN TINNED COPPER SIZES AS NOTED ON SPACE I I 12 SPACE (N)100 AMP BREAKER �'� <br /> PLAN. GND �� m <br /> PPC re 6 <br /> I <br /> 7. ALL HORRONTALLY RUN GROUNDING CONDUCTORS SHALL BE INSTALLED MINIMUM 30'BELOW M)5 AMP BREAKER BREAK OUT CYLINDERS(TYP) • Qu <br /> GRADE/FROST-UNE IN TRENCH.U.N.O.,AND BACK RLL SHALL Be COMPACTED AS REQUIRED BY. . ` <br /> ARCHITECT. it l ' ` s <br /> 240/120V,200A,10,3W,I OkAIC n <br /> 8. ALL GROUND CONDUCTORS SHALL BE RUN AS STRAIGHT AND SHORT AS POSSIBLE,WITH A <br /> MINIMUM I2'BENDING RADIUS NOT LESS THAN 90 DEGREES. IG N I 2 <br /> 9. AU.SUPPORT STRUCTURES,CABLE CHANNEL WAYS OR WIRE GUIDES SHALL BE BONDED TO 1 200A 11007 12P x22P ?PA ?PA \ ) <br /> GROUND SYSTEM AT A POINT NEAREST THE MAIN GROUNDING BUS'MGB'(OR DIRECTLY TO ° q/ 4 q <br /> GROUND-RING). (E)GND (N)EQUIPMENT <br /> g ( 1 SECTOR GROUND zi <br /> 10. ACCEPTABLE CONNECTIONS FOR GROUNDING SYSTEM SHALL Be: SA CABINETS BARS(M7 m Rte <br /> a.BURNDY,HY•GRADE U.4 WED CONNECTORS FOR INDOOR USE ORAS APPROVED BY - lg <br /> CLEARDIRE PROJECT MANAGER. :g. _� E 1 <br /> b. CADW5D,EXOTHERMIC WELDS WELDED CONNECTIONS). cNi UPPER GROUND BAR III Z 8 Ili <br /> a TWO 42)HOLE TINNED COPPER COMPRESSION(LONG BARREL)FITTINGS(BUS BAR 55ll <br /> CONNECTIONS). �' cl �� Ll ., 1 .1 {( <br /> II. ;CCALL CRIMPED CONNECTIONS SHALL HAVE EMBOSSED MANUFACTURERS DIEMARK VISIBLE AT THE m n4 <br /> CRIMP(RESULTING FROM USE Of PROPER CRIMPING DEVICES). (E)LIGHT (E)PLUG V O' ' <br /> 12. PRIOR TO ANY WG-BUSBAR CONNECTIONS,THE BUSBAR SHALL DE CLEANED BY USE OF . _ 1� <br /> SCOTCH-BRITT OR PLAIN STEEL.WOOL AS TO REMOVE ALL SURFACE OXIDATION AND ECAB BCAB • W N o a <br /> CONTAMINANTS.A COATING OF'NO-OX-1D'SHALL BE APPLIED TO THE CONNECTION SURFACES. <br /> SINGLE UNE DIAGRAM EQUIPMENT GROUND a f <br /> o: <br /> 13. ALL CONNECTION HARDWARE SHALL BE TYPE 3I G 55(NOT ATTRACTED TO MAGNETS). a •' fill <br /> 14. THE GROUND RING SHALL BE INSTAUED 24'MINIMUM BEYOND ANY BUILDING DRIP UNE. SINGLE LINE/ PANEL DIAGRAM GROUNDING DIAGRAM <br /> 15. ELECTRICAL SERVIC`.EQUIPMENT GROUNDING SMALL COMPLY WITH NEC,ARTICLE 250-82 AND <br /> II NTS O NTS <br /> SHALL BOND ALL POSTING AND NEW GROUNDING ELECTRODES. NEW GROUNDING ELECTRODE <br /> SHALL INCWDE BUT NOT UMTTED TO GROUND RODS.GROUND RING IF SERVICE 5 WITHIN THE ��.'�, i <br /> RADIO EQUIPMENT LOCATION,BUILDING STEEL IF APPLICABLE,COW WATER CONNECTIONS MUST MINIMUM OF 75%OR rf�' <br /> BE MADE ON THE STREET SIDE Of MAIN SHUT-OFF VALVE. <br /> _— 270'IN ANY DIRECTION !'j <br /> GPS UNIT c:::( - <br /> GPS e � <br /> DOWNTILT BRACKET ,ux•AL ° <br /> 0 i sal 40 STAINLESS <br /> STEEL OR GALV PIPE <br /> MOUNT PIPE UNSTRUT P 1000& A _ <br /> i ���; LENGTH AS REQ,2 MIN T N <br /> �O` LV4 RPE TO P I • <br /> OI O SECURE TO SHEET METAL _ <br /> (N)PANEL ANTENNA PER PLAN SGANG NUT,TM <br /> j ENCLOSURE USING:0Y;SHEET BELOW UC 5 TIONS MUST 80Tf1 SW AM <br /> #2 AWG FROM EQUIPMENT BLIRINDI TYPE GAR <br /> MAST '`'� MZ u SCREWS(2 PER <br /> UNISTRIlq 'J TOWER <br /> TO BE GROUNDED GROUND WG#2 AWG TO GROUND _ <br /> NOTE: i2 AWG TO GROUND -��, uJ <br /> MOUNTING CONFIGURATIONS VARY FROM ar!� z 5E52XC336 <br /> GROUND BAR I I I I I i I SITE TO SITE;CONFIRM SPECIFIC MOUNTING GFS COPPER GROUND BAR � 70980TH SW <br /> CONFlGURATION Wl ANTENNA LAYOUTS. ...%), z EVERETT,WA 98203 <br /> #2 AWG GROUND WIRE <br /> nnnn ;gin n ROUND MINIMUM SKY VIEW REQUIREMENTS ISSUE STATUS <br /> ® tit-0&-4111=1►-( !=i <br /> u u u v `v u (N)RRH PER PIAN 014'COAXIAL CABLE A DATE DESCRIPTION <br /> IDUAL.CADWELDS,TOBE I •-- (N)#G AWG RRH GROUND CONDUCTOR GPS ANTENNA GROUNDING * SPECIFICATIONSGI � " �' <br /> IUSED V,4 if 2 AWG ECW <br /> TO GROUND RING I AT TOP <br /> II <br /> SEAL �' <br /> t2 AWG MAST GROUND CONDUCTOR• 1/2'=I' <br /> 1 NOTES: <br /> (E)COPPER GROUND BUS BAR <br /> I'OVC MAITRE - --- i- 1. THE GPS ANTENNA MOUNT 5 DESIGNED TO FASTEN TO A STANDARD I-I/4'DIAMETER, DRAWN J.K MBERIIN <br /> SCHEDULE 40,GALVANIZED STEEL OR DTA/MESS ESS STEEL RPE.THE PIPE MUST NOT Be CHECKED BY: T.D CART O <br /> NOTE: (N)Yz'COAX JUMPERTHREADED AT THE ANTENNA MOUNT END.THE PIPE SHALL BE CUT TO THE REQUIRED <br /> I. CONTRACTOR TO UTRIZE!OFR-SHIELD(MANS A BETTS)ON 1 L TO GROUND LENGTH(MINIMUM OF 18 INCHES)USING A HAND OR ROTARY PIPE CUTTER TO ASSURE APPROVED BY: B.McCOMB <br /> ALL LUG CONNECTIONS OR APPROVED EQUAL (L7 HYBRID ANTENNA CABLE ROWED TO -.41/11111.' A SMOOTH AND PERPENDICULAR CUT.A HACK SAW SHALLNOT BE USED.THE CUT <br /> 2. ALL LUGS TO BE DUAL HOLE LONG BARREL AND CRIMPED MATCH(E)AND/OR UNDERGROUND CONDUIT PIPE END SHALL BE DE-BURRED AND SMOOTH IN ORDER TO SEAL AGAINST THE DATE: MOM 17 <br /> TWICE WITH MFRS RECOMMENDED TOOL PATH TO MMBS CABINET MUDROOM NEOPRENE GASKET ATTACHED TO THE ANTENNA MOUNT. SHEET TITLE: <br /> 2. IT 5 CRITICAL THAT THE GPS ANTENNA IS MOUNTED SUCH THAT IT 5 WITHIN 2 <br /> © GROUNDING BAR CONNECTION DETAIL © ANTENNAIRRII CABLE ROUTINGDEGREES OF VERTICAL AND THE BASEOFTHE ANTENNA 5WITHIN 2DEGREES OF GROUNDING DETAILS <br /> NTS NTS 3. DO NOT SWEEP TEST GPS ANTENNA /� SHEETrNUMBER <br /> 4. IT IS CRITICAL THAT THE GPS ANTENNA IS MOUNTED SUCH THAT MIN.SKY VIEW GJ 1'� I <br /> REQUIREMENTS ARE MET,(SEE ABOVE). 6/ L <br />