My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 3/10/2023
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 3/10/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 3:59:13 PM
Creation date
8/8/2023 3:57:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
3/10/2023
Council Approval Date
1/18/2023
End Date
12/31/2023
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Hannabrook Park Improvements
Tracking Number
0003877
Total Compensation
$80,000.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HANNABROOK PARK <br /> NATURE FITNESS TRAIL <br />ESTIMATE <br />GL <br />EQUIPMENT <br />ENERGI Fitness Stations 24,944.00$ <br />Surface Material--Engineered Wood Fiber 4,560.00$ <br />Subtotal 29,504.00$ <br />Discount (2,722.40)$ <br />Freight 3,530.00$ <br />EQUIPMENT TOTAL 30,311.60$ <br />CERTIFIED INSTALLATION <br />Site Preparation: Excavation; Removals; Compacted Base Stone; Double 31,212.00$ <br />Installation: Equpment; Surface Material 21,898.56$ <br />INSTALLATION TOTAL 53,110.56$ <br />EQUPMENT AND INSTALLATION SUBTOTAL 83,422.16$ <br />TAX (9.9%)8,258.79$ <br />EQUPMENT AND INSTALLATION TOTAL 91,680.95$ <br />CONTINGENCY 9,168.10$ <br />TOTAL PROJECT ESTIMATE 100,849.05$ <br />rev. 7/8/2022
The URL can be used to link to this page
Your browser does not support the video tag.