My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 8/10/2023 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2024
>
BHC Consultants 8/10/2023 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2023 2:52:52 PM
Creation date
8/11/2023 11:49:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
8/10/2023
Council Approval Date
8/9/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Evergreen Pump Station Upgrades
Public Works WO Number
UP3739
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002242
Total Compensation
$42,058.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A <br />The original contract between the City of Everett (City) and BHC Consultants included a task (task 500) <br />for engineering services during construction. The fee associated with this task was estimated prior to <br />design. Some details of the project and an extended construction duration period resulted in effort that <br />exceeded what was initially estimated in some cases. The additional engineering services during <br />construction are as follows: <br />Task 700 – Additional Engineering Services During Construction. $42,058 <br />Subtask 701 – Project Management. $16,206 <br />The overall construction schedule is significantly longer than what was initially estimated, mostly due to <br />delayed procurement timelines. An additional 9 months of ESDCs and contract administration is <br />required. The cost breakdown of the additional fee for this subtask is shown in the attached Exhibit A-1. <br />Subtask 702 – Engineering Review. $7,182 <br />The project has required the review of more submittals, RFIs, and other documentation than were <br />initially estimated. The cost breakdown of the additional fee for this subtask is shown in the attached <br />Exhibit A-1. <br />Subtask 703 – Site Visits. $8,889 <br />As the construction duration extends beyond what was initially planned, additional site visits are <br />needed. This fee includes travel, time spend on-site, and development of trip summary memo. The cost <br />breakdown of the additional fee for this subtask is shown in the attached Exhibit A-1. <br />Subtask 704 – Meetings. $9,781 <br />As the construction duration extends beyond what was initially planned, additional meetings are <br />needed. This fee assumes two staff will attend an additional 22 meetings lasting 1 hour each. <br />
The URL can be used to link to this page
Your browser does not support the video tag.