My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 72 00 - 31 <br /> will be made in the payments due or to become due to the Contractor. Final Acceptance will not act as a <br /> ' waiver of the Owner's right to recover from the Contractor an amount representing the deduction for <br /> retention of defective and/or noncompliant Work. <br /> 8.8. MATERIALS AND EQUIPMENT FURNISHED BY OWNER <br /> ' Contractor shall install materials and Equipment furnished by the Owner as provided in the technical <br /> sections of the Specifications. Furnishing of material and Equipment by the Owner will be considered <br /> conclusive evidence of their acceptability for the purpose intended. If the Contractor discovers defects in <br /> material or Equipment furnished by the Owner,he or she shall immediately notify the Owner. After such <br /> discovery,the Contractor shall not proceed with Work involving Owner-furnished materials and <br /> Equipment unless authorized by the Owner. Unless otherwise noted or specifically stated,materials and <br /> ' Equipment furnished by the Owner,which are not of local occurrence or manufacture,are considered to <br /> be"FOB"railroad station or truck terminal nearest to the Site of the Work. At no cost to the Owner,the <br /> Contractor shall unload,transport, store,and protect such material and Equipment from damage. The <br /> Contractor shall inspect such Owner-furnished material and Equipment on receipt and provide the Owner <br /> with written acceptance for the incorporation of said material and Equipment into the Work. After receipt <br /> by the Contractor,the Contractor bears all risk of loss and casualty to Owner furnished materials and <br /> Equipment. <br /> 8.9. GUARANTEE <br /> The Contractor warrants to the Owner that all materials and Equipment furnished under this Contract will <br /> be of highest quality and new unless otherwise specified by the Owner,free from faults and defects and in <br /> conformance with the Contract Documents.All Work not so conforming to these standards shall be <br /> considered defective. If required by the Owner's Representative,the Contractor shall furnish satisfactory <br /> evidence as to the kind and quality of materials and Equipment. <br /> The Work furnished must be of first quality and the workmanship must be the best obtainable in the <br /> various trades. The Work must be of safe,substantial and durable construction in all respects. <br /> "Acceptance of the Work" shall not extinguish any covenant or agreement on the part of the Contractor to <br /> be performed or fulfilled under this Contract that has not,in fact,been performed or fulfilled at the time <br /> of such acceptance. All covenants and agreements shall continue to be binding on the Contractor until <br /> ' they have been fulfilled. <br /> The Owner and the Contractor agree that the guarantee on the completed portions of the Work possessed <br /> and used by the Owner shall commence as to those portions on the date that the Owner takes possession <br /> ' of those portions and so notifies the Contractor in writing. Owner and Contractor further agree that such <br /> taking possession and use shall not be deemed as acceptance of the Work. Takeover of completed <br /> portions of the Work shall be at the Owner's option and will not be made until the Work can be put into <br /> ' routine service on a permanent basis. <br /> The guarantee provided in this section 8.9 shall be in addition to those specific guarantee or warranty <br /> requirements for particular Equipment and Work items as indicated in the Specifications. <br /> 8.10. CORRECTION PERIOD <br /> If within one year after the date of Substantial Completion,or such longer period of time as may be <br /> prescribed by the terms of any applicable special guarantee or warranty required by the Contract <br /> ' Documents)or by any specific provision of the Contract Documents,any Work is found to be defective, <br /> or if the repair of any damage to the land or areas made available for Contractor's use by Owner or <br /> permitted by Laws and Regulations as contemplated in Paragraph 8.6.6.is found to be defective, <br /> Contractor shall promptly,without cost to Owner and in accordance with Owner's written instructions: <br /> 1. repair such damaged land or areas; or <br /> 2. correct such defective Work;or <br /> 00 72 00 - 31 GENERAL CONDITIONS <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.