My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 41 <br /> I <br /> Any costs experienced during mobilization activities for labor,equipment,materials or services shall be <br /> ' listed in that section of the Force Account summary and paid accordingly. <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. <br /> When Work is performed on a Force Account basis by one or more approved Subcontractors,by lower- <br /> ' tier Subcontractors or Suppliers,or through invoice by firm(s)acting in the manner of a Subcontractor, <br /> the Contractor will be allowed an additional markup,from the table below,applied to the costs computed <br /> for Work done by each Subcontractor through 9.6.1,9.6.2,9.6.3,and 9.6.4,to compensate for all <br /> ' administrative costs,including project Overhead,general company Overhead,profit,bonding,insurance, <br /> Business&Occupation tax,and any other costs incurred. <br /> A firm may be considered to be acting as a Subcontractor when the Owner's Representative observes one <br /> or more of the following characteristics: <br /> 1. The person in charge of the firm's activities takes an active role in managing the overall project, <br /> including extensive coordination,interpretation of Drawings,interaction with the Owner or <br /> ' management of a complex and interrelated operation. <br /> 2. Rented equipment is provided fueled,operated and maintained by the firm. Operators of rented <br /> equipment are supervised directly by the firm's representative. There is a little interaction <br /> between the Contractor and the employees of the firm. <br /> 3. The firm appears to be holding the risk of performance and quality of the Work. <br /> 4. The firm appears to be responsible for liability arising from the Work. <br /> Markups on Work Performed by Subcontractor(s): <br /> On amounts paid for Work performed <br /> by each Subcontractor on each <br /> Force Account and calculated Up to$25,0000 12% <br /> through 9.6.1-4 <br /> On amounts greater than $25,000 up to$100,000 10% <br /> On amounts greater than $100,000 7% <br /> The amounts and markup rates shall be calculated separately for each Subcontractor on each Force <br /> ' Account item established. <br /> The payments provided above shall be full payment for all Work done on a Force Account basis. The <br /> ' calculated payment shall cover all expenses of every nature,kind and description,including those listed <br /> above and any others incurred on the Work being paid through Force Account. Nothing in this provision <br /> shall preclude the Contractor from seeking an extension of time or time-related damages to unchanged <br /> Work arising as a result of Force Account Work. The amount and costs of any work to be paid by Force <br /> ' Account shall be computed by the Owner's Representative and the result shall be final as provided in 3.2 <br /> OWNER'S REPRESENTATIVE. <br /> An item that has been bid at a unit price or lump sum in the Bid will not be paid as Force Account unless <br /> ' a change, as defined in ARTICLE 6.CHANGES,has occurred and the provisions require a payment <br /> adjustment. Items which are included in the Bid as Force Account or which are added by change order as <br /> Force Account may,by agreement of the parties at any time,be converted to agreed unit prices or lump <br /> sums applicable to the remaining Work. <br /> 9.7. RETAINAGE <br /> Pursuant to RCW Chap. 60.28,a sum of five percent(5%)of the monies earned by the Contractor will be <br /> ' retained from progress estimates. In addition to protecting the interests of those identified in RCW Chap. <br /> 60.28, such retainage shall be used as a trust fund for the protection of the Owner. <br /> ' At the option of the Contractor;monies retained under the provisions of RCW 60.28 shall be: <br /> 00 72 00 - 41 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.