My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 01 26 02 - 1 <br /> I REQUEST FOR INFORMATION <br /> To Architect: Owner's <br /> Representative: <br /> From Contractor: Document Reference: <br /> Signature: (Drawing Sheet,Detail No./Spec.Section) <br /> I <br /> ❑ Architectural ❑ Civil ❑ Structural ❑ Mechanical ❑ Electrical ❑ Other <br /> IRequest/Recommended Solution: <br /> I <br /> . <br /> N <br /> Q <br /> cc <br /> ❑ Attachments _ <br /> Date Required For Response: Initiated By: <br /> I <br /> (Name) (Firm) <br /> Architect's Response: <br /> I - <br /> a ❑ Attachments <br /> I <br /> cc Response By Firm: Date: <br /> NOTE: This is not an authorization to proceed with work involving additional cost and/or time. Notification must be given in accordance with the Contract <br /> Documents if any response causes any change to the Contract Sum and/or Contract Time. <br /> Copies: ❑Owner's Representative ❑Consultant ❑Other ❑File <br /> END OF SECTION 01 26 02 <br /> I <br /> I01 26 02 - 1 RFI TEMPLATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.