My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 33 00 -2 <br /> B. The Contractor is required to review and approve all shop drawings prior to submitting <br /> to Owner for review. All shop drawings received by Owner shall bear the Contractors <br /> stamp of approval. <br /> C. The Contractor shall provide the number of copies required for use by the contractor plus <br /> three (3)additional copies to be retained by the Owner for all items of work as requested <br /> by Owner or as required by the contract documents. The Owner or designee shall review <br /> and return all shop drawings to the Contractor within the specified time but no later than <br /> twenty (20) working days of receipt. The review of the shop drawings by the Owner or <br /> designee is for the limited purpose of checking for conformance with the design concept <br /> as expressed in the Contract documents. The review of shop drawings by the Owner <br /> and/or Architect/Engineer is not conducted for the purpose of determining the accuracy <br /> and completeness of other details such as dimensions, quantities, installation <br /> instructions, or equipment performance, all of which remain the responsibility of the <br /> Contractor. Approval of the shop drawings shall not release the Contractor from <br /> responsibility for deviations from the contract documents. The approval of any shop <br /> drawings that substantially deviates from the requirements of the contract documents <br /> shall be evidenced by change order. <br /> 2.2 SAMPLES <br /> A. Unless otherwise specifically directed by the Architect/Engineer, all samples shall be of <br /> the precise article proposed to be furnished. <br /> B. Submit the number of samples that are required to be returned plus two (2) that will be I <br /> retained by the Architect/Engineer. <br /> 2.3 I <br /> PART 3 - EXECUTION 1 <br /> 3.1 IDENTIFICATION OF SUBMITTALS 1 <br /> A. Consecutively number all submittals. Accompany each submittal with a letter of <br /> transmittal showing the transmittal number, date of transmittal, specifications section or <br /> drawing number to which the submittal pertains, brief description of the material <br /> submitted, and the company name of the originator of the submittal. <br /> B. Maintain an accurate submittal log for the duration of the construction period, showing <br /> status of all submittals. Make the log available to the Architect/Engineer upon request. <br /> 3.2 COORDINATION OF SUBMITTALS I <br /> A. Prior to submittal for Architect/Engineer's review, use all means necessary to fully <br /> coordinate all material, including the following: <br /> 1. Determine and verify all field dimensions and conditions. <br /> 01 33 00 -2 SUBMITTAL PROCEDURES 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.