My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 01 35 29 - 3 <br /> I <br /> suppliers. The Health and Safety Rep should be capable of identifying hazards within <br /> I the job site, take immediate actions to correct hazard and if needed, stop work until <br /> hazards have been corrected. <br /> B. The Contractor shall authorize the Health and Safety Representative to resolve safety- <br /> Irelated issues raised by the Owner. <br /> C. The Health and Safety Representative is responsible to insure that work is performed in <br /> Iaccordance with the Health and Safety Plan. <br /> D. At the daily job briefing and/or tailgate conference, Contractor shall provide the Owner's <br /> representative in attendance at the meeting all relevant information on the Work to be <br /> I <br /> performed, its location, and the equipment to be used. <br /> E. The Contractor is responsible to insure that its workers and subcontractors have all <br /> Isafety equipment required for the Work. <br /> F. Nothing in this Contract shall be construed as imposing any duty upon the Owner or any <br /> I of its employees with regard to, or as constituting any express or implied assumption of <br /> control or responsibility over, Project Site safety, or over any other safety conditions <br /> relating to employees or agents of Contractor or any of its Subcontractors, or the public. <br /> PART 2 - PRODUCTS (Not Used) <br /> IPART 3 - EXECUTION (Not Used) <br /> IEND OF SECTION 01 35 29 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 01 35 29 - 3 HEALTH AND SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.