My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 01 35 53 - 1 <br /> I <br /> SECTION 01 35 53 -SECURITY PROCEDURES <br /> PART 1 - GENERAL <br /> I <br /> 1.1 SUMMARY <br /> IA. Section Includes: Procedures to maintain security including unauthorized entry, <br /> vandalism, and theft to buildings and grounds at Project site. <br /> IB. Related Sections: <br /> 1. Section 01 31 19 - Project Meetings <br /> 1 2. Section 01 50 00—Temporary Facilities and Controls <br /> SECURITY PROGRAM <br /> I1.2 <br /> A. Arrange with Owner, at Preconstruction Meeting specified Section 01 3119, to set up <br /> security program to prevent unauthorized entry and to protect against other security <br /> Iproblems, including loss due to theft, vandalism, and fire. <br /> B. Arrange with Owner for access keys as necessary to perform Work of this Contract. <br /> I1. Keys Issued by Owner: Do not duplicate. Return to Owner at Final Completion. <br /> 2. Keys not returned: Re-key locks at Contractor's expense and provide new keys <br /> conforming to keying types required by Owner. <br /> IC. Establish adequate flood lighting to allow monitoring of Project site during evening <br /> hours. <br /> 1.3 STORAGE AND PROTECTION <br /> I A. Provide for secure lockup of stored materials and take additional measures to protect <br /> against theft vandalism, and other loss of property belonging to Owner located on site <br /> and at off-site facilities. <br /> I <br /> 1.4 ENTRY CONTROL <br /> IA. Restrict entrance of unauthorized persons and vehicles into construction areas. <br /> B. Maintain log with names and dates of those who enter site. <br /> IC. Maintain security of construction fencing and gates as approved by Owner in advance. <br /> Lock at end of each working day. <br /> ID. Maintain security site lighting systems as approved by Owner in advance. <br /> 1 01 35 53 - 1 SECURITY PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.