Laserfiche WebLink
City of Everett Inductive Charging Infrastructure for Field Installation 00 25 13 -2 <br /> I. Due to COVID-19 and in adherence to Mayor Franklin's Directive and Governor Inslee's <br /> Order, Contractors will be allowed to enter the building/construction site individually in <br /> keeping within the social distance guidelines. <br /> 1.6 ADDENDA 1 <br /> A. Questions received during the walk thru shall be emailed to Architectural consultant and <br /> City of Everett Representative and answered as addenda. ' <br /> B. All other questions or interpretations must be in writing and received by the city no later <br /> than 7 calendar days prior to the bid opening date. <br /> PART 2 - PRODUCTS (Not Used) <br /> I <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 00 25 13 <br /> I <br /> I <br /> 1 <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 00 25 13 -2 PRE-BID MEETING , <br /> 1 <br />