My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett Inductive Charging Infrastructure for Field Installation 00 4113 - 2 <br /> 1 <br /> ITEM NO. DESCRIPTION UNIT QUANTITY CONTRACT <br /> PRICE <br /> 1 <br /> 1. <br /> College Station EA 1 $ <br /> 2. SeawayTransit Center 1 <br /> EA 1 $ <br /> TOTAL (BASE BID) $ 1 <br /> Additive Everett Station EA 1 $ I <br /> TOTAL (BASE BID + ADDITIVE) $ I <br /> This Bid Form includes the Base Bid and an Additive. Bidder must bid on both Base <br /> Bid and Additive. Bids submitted without an Additive bid will be rejected. <br /> 111 The above does not include Washington state sales tax. The City will add <br /> appropriate Washington state sales tax to the contract price of the successful bidder. <br /> At the City's sole discretion, the Project awarded will be either: III <br /> > the Base Bid, in which case the Project will include College Station and <br /> Seaway Transit Center, and the lowest bidder will be determined by the lowest <br /> TOTAL (BASE BID); or <br /> > the Base Bid + Additive, in which case the Project will include College <br /> Station, Seaway Transit Center and Everett Station, and the lowest bidder will <br /> be determined by the lowest TOTAL (BASE BID + ADDITIVE). <br /> Bid security is based on TOTAL (BASE BID). I <br /> 1.3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid <br /> closing date. <br /> B. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. , <br /> 2. Furnish the required 100% payment and 100% performance bonds within <br /> 14 calendar days of receipt of Notice of Award in the form described in <br /> Contract Documents. 111 <br /> 004113 - 2 BID FORM I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.