Laserfiche WebLink
City of Everett Inductive Charging Infrastructure for Field Installation 00 43 36 - 1 <br /> SECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br /> 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br /> installation and rebar installation, Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the <br /> Work, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work <br /> ' identified, unless Subcontractors vary with Bid alternates, in which case the Bidder <br /> must indicate which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation and air conditioning, plumbing, electrical work, <br /> structural steel installation and rebar installation, Bidder fails: (1) to submit <br /> as part of the Bid the names of such Subcontractors; (2) to name itself to <br /> ' perform such Work; or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation, air <br /> conditioning, plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors applies only to proposed heating, ventilation, air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors who will contract directly with the general contractor submitting the <br /> Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, and electrical portions of <br /> the chart below must be submitted with the bid proposal or within one hour of the <br /> I 6. published bid submittal time. <br /> The structural steel installation and rebar installation portions of the chart below <br /> must be submitted with the bid proposal or within forty-eight hours of the published <br /> ' bid submittal time. <br /> ' Type/Scope of Work Name and Address of Subcontractor or <br /> Bidder <br /> HEATING <br /> Subcontractor, bidder or "no work" MUST be <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> ' Subcontractor, bidder or"no work" MUST be <br /> stated <br /> I00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM <br />