My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 00 43 36 - 1 <br /> SECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br /> 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br /> installation and rebar installation, Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the <br /> Work, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work <br /> ' identified, unless Subcontractors vary with Bid alternates, in which case the Bidder <br /> must indicate which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation and air conditioning, plumbing, electrical work, <br /> structural steel installation and rebar installation, Bidder fails: (1) to submit <br /> as part of the Bid the names of such Subcontractors; (2) to name itself to <br /> ' perform such Work; or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation, air <br /> conditioning, plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors applies only to proposed heating, ventilation, air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors who will contract directly with the general contractor submitting the <br /> Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, and electrical portions of <br /> the chart below must be submitted with the bid proposal or within one hour of the <br /> I 6. published bid submittal time. <br /> The structural steel installation and rebar installation portions of the chart below <br /> must be submitted with the bid proposal or within forty-eight hours of the published <br /> ' bid submittal time. <br /> ' Type/Scope of Work Name and Address of Subcontractor or <br /> Bidder <br /> HEATING <br /> Subcontractor, bidder or "no work" MUST be <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> ' Subcontractor, bidder or"no work" MUST be <br /> stated <br /> I00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.