My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett Inductive Charging Infrastructure for Field Installation 00 63 25 - 1 <br /> SECTION 00 63 25 -SUBSTITUTION REQUEST FORM <br /> PROJECT: Inductive Charging Infrastructure for Field Installation <br /> ' REQUEST NO.: <br /> ' CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for <br /> above project: <br /> Section Specified Item <br /> I <br /> Proposed Substitution <br /> ' Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> Attach detailed comparison of the significant qualities (size, weight, durability, <br /> performance and similar characteristics, and including visual effect where applicable) for <br /> the proposed substitution in comparison with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required <br /> by proposal. <br /> Fill in Blanks Below: <br /> A. Does substitution require change in Drawing dimensions? <br /> B. Will Undersigned payfor resultingbuildingdesign changes includingengineering <br /> 9 9 9 9 9 <br /> and detailing costs? <br /> C. What effect does substitution have on other trades? <br /> D. Differences between proposed substitution and specified item? <br /> E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> F. Name and address of three (3) similar projects on which product was used, and <br /> date of installation <br /> t <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> 00 63 25 - 1 SUBSTITUTION REQUEST FORM <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.