My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 5 <br /> Total Float: The amount of time any given activity or path of activities may be delayed before it will <br /> ' affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians,bicyclists,wheelchairs,and <br /> equestrian traffic. <br /> ' Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor's Overhead <br /> costs realized by the result of reduced Project or Contractor billings,or both,due to any reason <br /> whatsoever,including a Project extension. <br /> ' Unit Price Work: Refers to items of Work identified by unit prices in the Bid form. <br /> Work: Refers to the Project and the provision of all labor,materials,Equipment, supplies,services,and <br /> ' other items necessary for the execution,completion and fulfillment of the Contract. <br /> 1.2. CONTRACT DOCUMENTS <br /> The complete Contract includes the following,which are Contract Documents: <br /> ' 1. Federal and state requirements that apply to this Contract and Project; <br /> 2. Supplemental agreements between Owner and Contractor,if any, subsequent to the Owner's <br /> ' execution of the Contract and signed by the Mayor of the City of Everett for Owner and by an <br /> authorized representative of Contractor <br /> 3. Change Orders; <br /> ' 4. Addenda; <br /> 5. The Contract; <br /> ' 6. Bid Form; <br /> 7. Specifications,including,but not limited to,these General Conditions and other numbered <br /> Documents and Sections; <br /> 8. Supplementary Conditions,if any; <br /> 9. Drawings and plans; <br /> 10. City of Everett standard plans in effect as of the date Bids are opened; <br /> ' 11. Notice to Bidders/Instructions to Bidders;and <br /> 12. Certifications and affidavits as required by this Contract and by law. <br /> ' Any inconsistency in the parts of the Contract shall be resolved by following this order of precedence in <br /> the list above(e.g., 1 presiding over 2,3,4, 5,and 6;2 presiding over 3,4, 5,and 6; and so forth). This <br /> order of precedence shall not apply when Work is required by one part of the Contract but omitted from <br /> ' another part or parts of the Contract.The Work required in one part must be furnished even if not <br /> mentioned in other parts of the Contract. <br /> These parts complement each other in describing the complete Work.Any requirement in one part binds <br /> as if stated in all parts. The Contractor shall provide any work or materials clearly implied in the Contract <br /> even if the Contract does not mention it specifically.Any inconsistency in the parts of the Contract shall <br /> be referred to the Owner's Representative attention for a determination of the intended requirements. <br /> ' The Work required in one part must be furnished even if not mentioned in other parts of the Contract.If <br /> any part of the Contract requires Work that does not include a description for how the Work is to be <br /> performed,the Work shall be performed in accordance with standard trade practice(s).For purposes of <br /> the Contract,a standard trade practice is one having such regularity of observance in the trade as to justify <br /> an expectation that the Contractor will follow or observe the practice in performing the Work.In case of <br /> any ambiguity,disagreement or Dispute over interpreting the Contract,the Owner's Representative's <br /> decision will be final as provided in these General Conditions. <br /> 00 72 00 - 5 GENERAL CONDITIONS <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.