My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 72 00 - 24 <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. , <br /> 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK ' <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety,and the Contractor agrees to perform the Work as changed.Among <br /> others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work,Equipment or material to be provided under this Contract, <br /> and ,2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs,or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities,Equipment,materials, services,or sites,provided by the Owner, and ' <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> and Contract Time,the Owner may,at its sole option,unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> Contractor without explicit notice from the Owner to proceed. <br /> 6.2 EXTRA WORK <br /> At its sole option,the Owner may(1)perform Extra Work itself,(2)employ others to do it, (3)direct the <br /> Contractor to perform the Extra Work at existing unit bid price,(4)direct the Contractor to perform the I <br /> Extra Work at a mutually agreed upon price,or(5)direct the Contractor to perform the Extra Work on a <br /> Force Account basis. <br /> 6.3 CHANGE ORDERS <br /> Changes to the Work may result in an increase or decrease in Contract Sum,as provided in 9.2. <br /> PAYMENT FOR CHANGES.Requests for an increase in Contract Time must be made as provided in <br /> 5.2.2.2 Extensions of Contract Time,as applicable. Substantial changes in Contract Time,Contract <br /> Sum or Work will often be negotiated and agreed between the Contractor and Owner before the Owner <br /> directs the Contractor to proceed with the change. <br /> If the Contractor and Owner agree on the scope of Work and any changes to Contract Sum and Contract <br /> Time,the Contractor and Owner shall execute an agreed Change Order. However,if the Contractor and <br /> Owner do not agree,the Owner may,in its sole discretion,issue a unilateral Change Order changing the <br /> scope of Work and making any adjustments to the Contract Sum pursuant to 9.2.PAYMENT FOR <br /> CHANGES and Contract Time in such amount and for such time as the Owner thinks appropriate. <br /> Contractor agrees to use the agreed and unilateral Change Order forms included in the Contract <br /> Documents or otherwise provided by Owner. The Contractor accepts all requirements,terms and <br /> conditions of a Change Order by: signing it;writing a separate acceptance; or by failing to notify the <br /> Owner immediately in writing that Contractor disagrees with the Change Order and does not intend to be <br /> bound by its terms. <br /> The Contractor waives all Contract Claims with respect to(and is estopped from denying its agreement <br /> with)any unilateral Change Order for which the Contractor does not immediately give Notice to the <br /> Owner as provided in ARTICLE 10.NOTICE TO OWNER and submit a Contract Claim as provided <br /> 00 72 00 - 24 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.