Laserfiche WebLink
<br />Page 19 of 27 <br /> <br />3.5 INTERVIEWS AND DEMONSTRATIONS <br />The City of Everett may request an interview or demonstrations with the highest-ranked Supplier(s). The <br />purpose of the interview, if held, will be to further review the finalist(s) in specific areas to determine <br />which proposal provides the best fit and value to the City of Everett. Finalist(s) must have key employees <br />available for these interviews. The City of Everett will notify the finalist(s) as to the time, date, and <br />location for an interview or conference call. <br />