My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/08/16 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/08/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 9:22:40 AM
Creation date
8/17/2023 9:19:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Call for Bids for Beverly Lake Water Quality Retrofit <br />Council Bill # <br /> <br />Project: Beverly Lake Water Quality Retrofit <br />Partner/Supplier: Washington State Department of Ecology <br /> Location: Beverly Lane and 75th Street SE in the vicinity of Beverly Lake <br />Preceding action: WA Dept of Ecology (DOE) Grant Amendment to Extend #2 3/1/23; WA DOE Grant Amendment to Extend #1 12/8/21; Authorization to Sign WA DOE Grant Agreement 4/8/20 <br />Fund: 401 Utilities <br />Agenda dates requested: <br />August 16, 2023 <br /> <br />Briefing <br />Proposed action <br />Consent 8/16/23 <br />Action <br />Ordinance <br />Public hearing <br /> Yes x No <br /> <br />Budget amendment: <br /> Yes x No <br /> <br />PowerPoint presentation: <br /> Yes x No <br /> <br />Attachments: <br />Vicinity Map <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Souheil Nasr <br /> <br />Phone number: <br />425-257-7210 <br /> <br />Email: <br />SNasr@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The engineer’s construction estimate for the project is $1,230,300. The plans and systems <br />ordinance allocated $1,500,000 for the project construction with funds coming from the <br />following sources: <br /> <br />WA State Department of Ecology Grant $ 645,000 <br />Fund 401 – Water/Sewer Utility Fund $ 855,000 <br />Total Funds $ 1,500,000 <br /> <br />Project summary statement: <br />The plans and specifications are complete, and the Beverly Lake Water Quality Retrofit project <br />is ready to be advertised for construction bids. <br /> <br />The project will construct three water quality treatment facilities within city right of way to <br />treat stormwater runoff from streets and adjacent properties before it is discharged to Beverly <br />Lake and Pigeon Creek No. 1. Currently stormwater runoff from these areas is untreated. The <br />project also includes associated stormwater piping and street restoration. <br />Recommendation (exact action requested of Council): <br />Authorize a call for bids for the Beverly Lake Water Quality Retrofit project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.