My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1930 JACKSON AVE 2023-08-23
>
Address Records
>
JACKSON AVE
>
1930
>
1930 JACKSON AVE 2023-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2023 3:41:32 PM
Creation date
8/22/2023 7:20:49 AM
Metadata
Fields
Template:
Address Document
Street Name
JACKSON AVE
Street Number
1930
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumio <br /> SMART ENERGY TODAY <br /> ■ � STRONGHOLD ATTACHMENT WITH BUTYL ' 1550 DI$ITAL043,DUSAEHI,UT <br /> NMI <br /> 8 <br /> UMOUNT <br /> ■o AL INSTALLATION GUIDE ; PAGE <br /> -----_----____________________________________________________________________________________________________________________________ <br /> SYSTEM INFO <br /> (11)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> _ (11)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:4.400 kWDC <br /> AC SYSTEM SIZE:3.300 kWAC <br /> p ® o REVISIONS <br /> DESCRIPTION DATE REV <br /> p ~J o o REVISION 05/23/2023 F A <br /> e o <br /> PROJECT NAME&ADDRESS <br /> M <br /> O <br /> N <br /> 00 <br /> 61 <br /> a <br /> INSTALLING STRONGHOLD DTD BUTYL ATTACHMENT OVER SHINGLE OVERLAP OR GAP l o <br /> If the attachment falls over a shingle overlap, level the surface by following below steps: Q 6' w <br /> A. Measure the attachment overhang. o z a w Q o <br /> LO <br /> B. Cut the butyl pads to required size. Q o w U) <br /> C. Stack extra butyl pad layers as necessary to level the roof and place the attachment. E73 z o <br /> Q wW CD <br /> D. Begin installation with the screws on the upslope side of the attachment and continue to install the screws on the downslope side of the attachment. _j Of IUj > <br /> 0 Q <br /> PRO TIP Y a 0 Q <br /> If the attachments overlap from one shingle course to the next shingle course in a rail-based system, reposition the attachment by moving up or down the shingle Y <br /> course along the same rafter line to avoid butyl layering. Q <br /> 0 <br /> rn <br /> DATE:5/23/2023 <br /> SHEET NAME <br /> ©WARNING EQUIPMENT <br /> Installing attachment on uneven surfaces,shingle gaps or overlaps,creates a risk for water leakage and <br /> SPECIFICATIONS <br /> rail clamp misalignment due to gap created between the adhesive and roof surface. SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.