My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1930 JACKSON AVE 2023-08-23
>
Address Records
>
JACKSON AVE
>
1930
>
1930 JACKSON AVE 2023-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2023 3:41:32 PM
Creation date
8/22/2023 7:20:49 AM
Metadata
Fields
Template:
Address Document
Street Name
JACKSON AVE
Street Number
1930
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumio <br /> SMART ENERGY TODAY <br /> ■■ STRONGHOLD ATTACHMENT WITH BUTYL ' 1550 DI8ITAL4043,DUSAEHI,UT <br /> U , 8 <br /> ■■ M 0 U N INSTALLATION GUIDE ; PAGE <br /> ______________________________________________________________________________________________________________________________________ <br /> SYSTEM INFO <br /> (14)Q CELLS <br /> Q.PEAK DUO BILK ML-G10+ <br /> (400 W) <br /> (14)ENPHASE <br /> \ IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:5.600 kWDC <br /> AC SYSTEM SIZE:4.200 kWAC <br /> a ® o REVISIONS <br /> p -o p DESCRIPTION DATE REV <br /> p <br /> 0 <br /> \ PROJECT NAME&ADDRESS <br /> N <br /> r=_ 00 <br /> a <br /> INSTALLING STRONGHOLD DTD BUTYL ATTACHMENT OVER SHINGLE OVERLAP OR GAP CD <br /> If the attachment falls over a shingle overlap. level the surface by following below steps: w <br /> o <br /> Z w o w co <br /> A. Measure the attachment overhang. o z w o <br /> B. Cut the butyl pads to required size. Q o w ULO <br /> C. Stack extra butyl pad layers as necessary to level the roof and place the attachment. 2i E73 z o <br /> Q wIU w o <br /> D. Begin installation with the screws on the upslope side of the attachment and continue to install the screws on the downslope side of the attachment. -J o > <br /> p Q <br /> PRO TIP Y a- o Q <br /> If the attachments overlap from one shingle course to the next shingle course in a rail-based system, reposition the attachment by moving up or down the shingle Y <br /> course along the same rafter line to avoid butyl layering. Q <br /> 0 <br /> Note: r) <br /> Extra butyl pads are NOT inctuoed in the KIT_ <br /> • Pre-stock with extra butyl pads from Unlrac Kits In case instattation is requires over overlap or flap. DATE:3/18/2023 <br /> SHEET NAME <br /> WARNING - - EQUIPMENT <br /> Instatting attachment on uneven surfaces,shingle gaps or overlaps,creates a risk for water leakage and <br /> LSPECIFICATIONS <br /> rail clamp misalignment due to gap created between the adhesive and roof surface. SHEET SIZE <br /> ANSI B <br /> X11" X 17" <br /> SHEET NUMBER <br /> PV 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.