Laserfiche WebLink
DEMOLITION PERMIT APPLICATION <br />EVERETT <br />WASHINGTON <br />CITY OF EVERETT PERMIT SERVICES <br />SUBMITTAL INSTRUCTIONS: Drop off hard copy paper application & plan to 3200 Cedar Street 2nd Floor Intake Drop Box. <br />CONTACT INFORMATION: (P) 425-257-88101 (E) PermitServices@everettwa.gov I (VI everettwa.govipermits <br />(Blue or Black Ink Only Please) PROJECT SITE INFORMATION G� <br />PROJECT SITE ADDRESS: STREET L o f PARCEL #7yv Qd3 C�C�B <br />CITY STATE (eQ - ZIP 2 <br />SUITEMNIT #: FLOOR #: ADDITIONAL LOCATION INFORMATION: <br />TENANT/BUSINESS NAME (if non-residential): S A -:;, CAS 1--. C <br />CONTACT INFORMATION <br />OWNER NAME: 1-� ill <br />OWNER MAILING ADDRESS: STREET S S 1 C <br />CITY CtKIC STATE &t ZT, Lv <br />OWNER PHONE: <br />-`) <br />JOWNER EMAIL: <br />CONTRACTOR CONTACT NAME: <br />WA STATE CONTRACTOR LICENSE)REQUIRED Ai OF EVERETT BUSINESS LICENSE #(REQUIRED). <br />CONTRACTOR ADDRESS: STREET '( i (;Lj A--n „ <br />CITY Q.�,�j{.�'�-�6�-� STATE e4>iZ 21p Cleo W <br />CONTRACTOR PHONE: _ -01(t>25 CONTRACTOR EMAIL:'0 I&p vv-, ` c4Zq� g OtiT I-r-�tt <br />PRIMARY CONTACT: kt OWNER C}IcCONTRACTOR ❑ OTHER (Please Specify) <br />CONTACT NAME: <br />CONTACT PHONE: q2- <br />CONTACT EMAIL: <br />DEMOLITION PERMIT INFORMATION <br />VALUATION OF WORK: I , c� .c9C9 ASSOCIATED PERMIT/LAND USE PROJECT # (Rapplicable): <br />(Valuation shall include the prevailing fair market value of all labor, materials. and equipment needed to complete the work, whether actually paid or not.) <br />BUILDING TYPE: QiUFR ❑Townhouse ❑Duplex ❑ADU ❑Multi -Family -# Units: ❑Commercial ❑Accessory Structure <br />DESCRIPTION OF WORK: <br /># OF SQUARE FEET REMOVED: <br /># OF DWELLING UNITS REMOVED: / <br />HISTORIC STRUCTURE: ❑Yes b4NO (Contact Planning Division to learn about additional requirements for historic structures (on Historic Registry orlocated in a Historic Overlay)). <br />SHORELINE/FLOODPLAIN PROXIMITY: ❑�gN Yes e (Contact Planning Division to learn about shoreline and Hoodplain requirements d structure being demolished is onfin either). <br />EXISTING UNDERGROUND TANK: NNo Tank ❑Yes- tank will stay in place -type: ❑Yes- tank to be removed - type: <br />UNDERGROUND TANK SIZE; NdNo Tank ❑Under 10,000 gallons ❑l0.000 gallons or over <br />PEDESTRIAN PROTECTION NEEDED: ❑Yes Wlo (Required when demolition is in close proximity to R.O.W. Include a pedestrian protection plan for review). <br />CONSTRUCTION FENCING NEEDED: ❑Yes NNo (If yes, show the temporary construction fencing location on the required site plan). <br />DUMPSTER IN R.O.W. NEEDED: ❑Yes FNo (If yes, apply for a separate Traffic Street Use Permit online at pw.everettwa.gov). <br />TRAFFIC CONTROL PLAN NEEDED: ❑Yes VQNo (Required when sidewalk, parking lane, or travel lane closure is needed. <br />If yes. apply for a separate Traffic Street Use Permit online at pw.everethwa.gov). <br />SEWER SERVICE CONNECTED TO BUILDING: ❑Yes 'Ar7�N�o (If yes, a separate Utility Permit will be issued for side sewer cap off prior to demolition). <br />WATER SERVICE CONNECTED TO BUILDING: ❑Yes END (If yes, cap at back side of meter prior to demolition and contact Utility Billing to stop billing) - <br />ELECTRICITY CONNECTED TO BUILDING: ❑Yes o (If yes, apply for separate Electrical Permit for disconnect and disconnect services prior to demolition). <br />ABATEMENT ACKNOWLEDGMENTS: The applicant is responsible for compliance with all local, state, and federal laws,codes, and regulations whether or not <br />described herein. By checking the box next to each abatement type below, I, the owner/applicant, acknowledge my responsibility, agree to the terms and conditions of the <br />requirements, and will abide by the requirements during construction. <br />Asbestos Abatement: Required in line with Puget Sound Clean Air Agency (PSCAA) htips:Rpsclesnaicgov/. An Asbestos/Demolition Notification must be submitted <br />to PSCAA before any asbestos removal or demolition begins and have the appropriate abatement report documentation on -site during consWclion. <br />Lead Paint Abatement: Contact the Snohomish Health District (SHD) https://www.snohd.org/ for applicable lead paint abatement requirements. <br />Rodent Abatement: Proper rodent abatement shall be conducted prior to demolition. <br />SITE PLAN REQUIREMENTS: Submit 2 hard copies of site plan showing buildings to be demolished with permit application to Permit Intake Drop Box or attach <br />electronic site plan with permit application if submitting electronically. Plans shall be in separate, compiled pdf, 8.5xl1 or 1 txl7 size. Naming convention: <br />Address DemOPefmitPlans. <br />ACKNOWLEDGEMENT. I have reviewed this application and confirm the information contained herein is true and correct. Work done pursuant to this permit most comply with <br />current federal state, and local law. The granting of a permit only authorizes approved work and no deviations therefrom. Deviations must first be authorized in writing from the <br />Building Official before being authorized under any circumstance. I am the owner or I am authorized by the owner of this property to perform the work for which application is made, <br />and I comply with the State Contractors Law 18.27 ROW and 296.200A WAG. <br />City of Everett Official UseOnly <br />PE 2 _(.OeDr <br />Date <br />(Revised 412112022) <br />