Laserfiche WebLink
EVERETT <br />WASHINGTON <br />DEMOLITION PERMIT APPLICATION <br />CITY OF EVERETT PERMIT SERVICES <br />SUBMITTAL INSTRUCTIONS: Drop off hard copy paper application & plan to 3200 Cedar Street 2nd Floor Intake Drop Box <br />CONTACT INFORMATION: (P) 425-257-8810 1 (E) PermdSeniices(@_everettwa.gov I M4 everettwa.(iovloermits <br />(Blue or Black Ink Only Please) PROJECT SITE INFORMATION <br />PROJECT SITE ADDRESS: STREET e:)If % tZ_ PARCEL #: QQ SS23 i <br />Cif' �%_ STATE (,() zip 2 <br />SUITE/UNIT #: FLOOR #: ADDITIONAL LOCATION INFORMATION: <br />TENANTIBUSINESS NAME (if non-residential): <br />CONTACT INFORMATION <br />OWNER NAME: /L7 <br />OWNER MAILING ADDRESS: STREET <br />CITY STATE ZIP <br />OWNER PHONE: — <br />JOWNER EMAIL: LA4_e)C_ \--C�� I r—,p C L� <br />CONTRACTOR CONTACT NAME: ` <br />WA STATE CONTRACTOR LICENSE (REOUIRED)a."a•'1 °" \A)'I <br />CITY OF EVERETT BUSINESS LICENSE #(REQ ED): <br />CONTRACTOR ADDRESS: STREET '( i �j kn) ,. <br />CITYSTATE <br />CONTRACTOR PHONE: _ 931n — o' j d�5 ICONTRACTOR EMAIL: <br />PRIMARY CONTACT: 0OWNER C*CONTRACTOR ❑ OTHER (Please Specify) <br />CONTACT NAME: <br />S A-'4tP3LLL ICONTACT <br />ICONTACT PHONE; , e1 _ ' (oS(n <br />EMAIL: jj4akZte k <b MA—C. tu+­� <br />DEMOLITION PERMIT INFORMATION <br />VALUATION OF WORK: $ (") ir:�Z9 . � ASSOCIATED PERMIT/LAND USE PROJECT # (dapplicable): <br />(Valuation shall include the prevailing fair market value of all labor, materials. and equipment needed to complete the work, whether actually paid or not) <br />BUILDING TYPE: EWR ❑Townhouse ❑Duplex ❑ADU ❑Multi -Family - # Units: ❑Commercial ❑Accessory Structure <br />DESCRIPTION OF WORK: L nu 3 , <br /># OF SQUARE FEET REMOVED: <br /># OF DWELLING UNITS REMOVED: / <br />HISTORIC STRUCTURE: ❑Yes 54No (Contact Planning Division to learn about additional requirements for historic structures (on Historic Registry allocated in a Historic Overlay)). <br />SHORELINE/FLOODPLAIN PROXIMITY: ❑Yes LINO (Contact Planning Division to learn about shoreline and gaodplain requirements 4 structure being demolished is onkn either). <br />EXISTING UNDERGROUND TANK: 19No Tank ❑Yes- tank will stay in place - type: ❑Yes- tank to be removed - type: <br />UNDERGROUND TANK SIZE; Flo Tank El Under 10,000 gallons ❑l0,000 gallons or over <br />PEDESTRIAN PROTECTION NEEDED: ❑Yes 5allo (Required when demolition is in dose proximity to R.O.W. Include a pedestrian protection plan for review). <br />CONSTRUCTION FENCING NEEDED: ❑Yes ®No (If yes, show the temporary construction fencing location on the required site plan). <br />DUMPSTER IN R.O.W. NEEDED: ❑Yes EhNo (If yes, apply for a separate Traffic Street Use Permit online at pw.everettwa.gov). <br />TRAFFIC CONTROL PLAN NEEDED: ❑Yes WNo (Required when sidewalk,. parking lane.. or travel lane closure is needed. <br />If yes. apply for a separate Traffic Street Use Permit online at pw.everettwa.gov). <br />SEWER SERVICE CONNECTED TO BUILDING: ❑Yes XINo (If yes, a separate Utility Permit will be issued for side sewer cap off prior to demolition;. <br />WATER SERVICE CONNECTED TO BUILDING: Dyes ®No (If yes, cap at back side of meter prior to demolition and contact Utility Billing to stop billing). <br />ELECTRICITY CONNECTED TO BUILDING: ❑Yes o (If yes, apply for separate Electrical Permit for disconnect and disconnect services prior to demolition). <br />ABATEMENT ACKNOWLEDGMENTS: The applicant is responsible for compliance with all local, state, and federal laws,codes, and regulations whether or not <br />described herein. By checking the box next to each abatement type below, I, the ovmer7applicant, acknowledge my responsibility, agree to the terms and conditions of the <br />requirements, and will abide by the requirements during construction. <br />RIN Asbestos Abatement: Required in line with Puget Sound Clean Air Agency (PSCAA) https Itpscleanair.gov/. M AsbeslosiDemolition Notification must be submitted <br />to PSCAA before any asbestos removal or demolition begins and have the appropriate abatement report documentation on -site during construction. <br />Lead Paint Abatement: Contact the Snohomish Health District (SHD) htips:llwww.snohd.org/ for applicable lead paint abatement requirements. <br />Rodent Abatement: Proper rodent abatement shall be conducted prior to demolition. <br />SITE PLAN REQUIREMENTS: Submit 2 hard copies of site plan showing buildings to be demolished with permit application to Permit Intake Drop Box or attach <br />electronic site plan with permit application if submitting electronically. Plans shall be in separate, compiled pdf, 8.5xl1 of 1 1x1 7 size. Naming convention: <br />Address DemoPennitPlans. <br />��• • •�..«��� 4lwc, i navy revmwao ous appncaion ana wnnrm me mromianon contained herein is true and correct. Work done pursuant to this permit must comply with <br />current federal, state, and local law The granting of a permit only authorizes approved work and no deviations therefrom. Deviations must first be authorized in writing from the <br />Building Official before being authorized under any circumstance. I am the owner or I am authorized by the owner of this property to perform the work for which application is made. <br />and 1 comply with the State Contractors Law 18,27 ROW and 296.200A WAC. <br />City of Evere# Official Use Only <br />TC-) ITZZC <br />Date (Revised 41212022) <br />