Laserfiche WebLink
WSDOT Contact:Emily Geralds <br />WSDOT E-mail: <br />WSDOT Phone:515-451-9594 <br />Agreement Number Contractor: <br />Term of Agreement <br />Vendor # <br />Service Area Contact: <br />Email: <br />Melinda Adams <br />madams@everettwa.gov <br />Funding by Project <br />Project Title: <br />UPIN #GT232501 <br />Scope of Work: <br />Funds <br />Current <br />Percentage Current Funds Projected Funds Total Funds <br />Green Transportation - MMA 80% $ 6,376,000 $ - $ 6,376,000 <br />Contractor's Funds 20% $ 1,594,000 $ - $ 1,594,000 <br />Total Project Cost 100% 7,970,000$ -$ 7,970,000$ <br />Budget: <br />Project Milestones <br />Phases Date <br />Preliminary Engineering Start Date 7/1/2023 <br />Environmental Documents (NEPA/SEPA) 8/1/2023 <br />Right of Way Certification N/A <br />Contract Award Date 6/1/2024 <br />Construction Operationally Complete 11/1/2024 <br />Green Transportation Grant Program <br />Capital Construction Grant Agreement <br />WHEREAS, the State of Washington in its Sessions Laws of 2023, Chapter 472 Section 221 authorizes funding for Public Transportation <br />Programs and other special proviso funding as identified in the budget through its 2023-2025 biennial appropriations to WSDOT; and <br />WHEREAS, the CONTRACTOR has requested funds for the project(s) or program(s) shown under the heading titled by <br />NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated <br />and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: <br />City of Everett <br />Everett Transit <br />3201 Smith Ave.; Suite 215 <br />Everett, WA 98201-4594 <br />THIS AGREEMENT, entered into by the Washington State Department of Transportation, hereinafter and the Contractor <br />Everett Transit - Diesel Bus Replacement with Battery Electric Buses <br />Replace diesel buses with five low-floor, battery electric buses. The electric buses will have dual- <br />charging capabilities, allowing them to utilize both cabinet and inductive chargers. Purchase and install <br />approximately six cabinet chargers. Install infrastructure for approximately six cabinet chargers. <br />Current Funds reflect total funding appropriated by the Washington State Legislature for the Project in the 2023-2025 <br />biennium. <br />PTD0772 <br />July 1, 2023 through the useful life of the <br />project equipment <br />916001248 <br />Snohomish <br />Section 1 <br />SCOPE OF WORK AND BUDGET <br />WHEREAS, WSDOT Public Transportation Division administers Green Transportation Grant Program funds to provide assistance solely for <br />transportation projects as identified in LEAP Transportation Document 2023-2 ALL PROJECT as developed on April 21, 2023, Program- <br />Public Transportation Program (V); <br />City of Everett <br />PTD0772 <br />1 of 17