Laserfiche WebLink
z 111z <br />6 16 <br />TYPICAL <br />THROUGHOUT <br />U.N.O. <br />TYP. <br />�— — L — — I <br />L 66'� L 1� 19 L '-5 1/2" 1�* <br />IF+i 10 <br />I <br />I'. <br />I <br />�I �'llll <br />/—�T <br />7'-2 1/2' <br />DN V <br />TYP. <br />Li—li—li I IJ 8 TVP. <br />110 <br />6 11 i6 Ll.' [JJ <br />TYPICAL 3 <br />THROUGHOUT TYP. 15 1315 <br />U.N.O. <br />n <br />2nd FLOOR DEMOLITION PLAN - AREA A <br />„ SCALE: 1/8"=V-0" <br />OPEN TO <br />BELOW <br />2nd FLOOR DEMOLITION PLAN - AREA B <br />„ SCALE: 1/8"=V-0" <br />DEMO PLAN KEY NOTES <br />N <br />C NO WORK IN THIS AREA UNLESS NOTED OTHERWISE <br />O <br />TYP THROUGHOUT, ALL CRACKS, HOLES, IMPERFECTIONS IN EXISTING WALLS, <br />PARTITIONS OR GYPSUM BOARD SHALL BE FILLED WITH PATCHING PLASTER AND <br />SMOOTHED OFF TO MATCH ADJOINING SURFACES. REMOVE EXISTING WALL <br />, <br />COVERING MATERIALS FROM REMAINING PARTITION WALLS (IF PRESENT). PATCH <br />V <br />AND REPAIR AFFECTED GWB SUBSTRATES AS REQUIRED FOR FINISH TREATMENT. <br />REFER TO FLOOR PLAN FOR ADDITIONAL INFORMATION. <br />Uj <br />O <br />DEMOLISH AND DISPOSE OF EXISTING WALL CONSTRUCTION (PARTIAL, GRID <br />HEIGHT&FULL HEIGHT), AS INDICATED WITH DASHED LINES. PROTECT EXISTING <br />ADJACENT SURFACES. PATCH AND REPAIR EXISTING, ADJACENT WALL <br />CONSTRUCTION AS REQUIRED. RELOCATE EXISTING WALL ACCESSORIES. GC TO <br />FIELD VERIFY EXISTING, HIDDEN STRUCTURAL COMPONENTS AND PROTECT FOR <br />DURATION OF PROJECT. COORDINATE WITH FLOOR PLAN. <br />.p <br />Oq <br />EXISTING WALL CONSTRUCTION TO REMAIN. PROTECT THROUGHOUT THE <br />N <br />DURATION OF CONSTRUCTION. <br />$ <br />O <br />EXISTING ENTRY GLASS PARTITION TO REMAIN. PROTECT THROUGHOUT THE <br />'j <br />DURATION OF CONSTRUCTION. PREP FRAME TO RECEIVE NEW FINISH. <br />1n <br />© <br />DEMOLISH EXISTING FLOORING AND BASE THROUGHOUT. PATCH AND REPAIR <br />Z <br />AFFECTED SUBSTRATE AS REQUIRED FOR INSTALLATION FOR NEW FLOOR FINISH <br />O <br />AND BASE MATERIALS. PREPARE EXISTING EXPOSED FINISH CONCRETE <br />SUBSTRATE AS REQUIRED FOR INSTALLATION OF NEW FINISH FLOORING <br />C 00 <br />N <br />MATERIALS. REFER TO FLOOR PLAN AND FINISH PLAN FOR ADDITIONAL <br />INFORMATION. <br />Q <br />EXISTING COLUMN AND ENCLOSURE TO REMAIN. PREPARE FOR NEW FINISH. <br />t <br />COORDINATE WITH FINISH PLAN. <br />N Gi <br />Og <br />EXISTING DOORS AND FRAMES TO REMAIN. PROTECT THROUGHOUT THE <br />DURATION OF CONSTRUCTION. PREP TO RECEIVE NEW PAINT FINISH.— <br />Og <br />DEMOLISH AND DISPOSE OF EXISTING DOORS, FRAMES, RELITES, HARDWARE <br />P m <br />AND ASSOCIATED COMPONENTS. PREPARE AFFECTED SUBSTATES TO <br />ACCOMMODATE NEW WORK. COORDINATE WITH OWNER FOR RETURN TO <br />BUILDING STOCK. <br />10 <br />DEMOLISH AND DISPOSE OF EXISTING MILLWORK (UNLESS OTHERWISE <br />REQUESTED TO BE RETAINED). TERMINATE AND CAP ALL EXISTING <br />SUPPLYNVASTE LINES BEHIND WALL AND/OR FLOOR. PATCH AND REPAIR <br />ZAP ENERGY <br />AFFECTED AREAS, INCLUDING BUT NOT LIMITED TO WALLS, FLOORS AND <br />CEILINGS AS REQUIRED MATCHING EXISTING FINISH MATERIALS, UNLESS NOTED <br />OTHERWISE. <br />Opus Seaway <br />11 <br />REMOVE AND SALVAGE FIRE EXTINGUISHERS, NETS, MARINE BRACKETS AND <br />Floor 1 & 2 <br />RTOFLOORPLAN OR <br />SIG AGE FOR REUSE AND REINSTALLATION. REFER <br />ADDITIONAL INFORMATION. <br />2300 Merrill Creek Pkwy <br />AND DISPOSE OF EXISTING12 LEI IN <br />ISH DEVICESPA <br />Everett, WA <br />PLA EL FROM THE PREVOUSTENANT, UN EISSNOT DOTTHERWISEANDIOR <br />CH AND <br />REPAIR AFFECTED AREAS, INCLUDING BUT NOT LIMITED TO WALLS, FLOORS AND <br />CEILINGS AS REQUIRED MATCHING EXISTING FINISH MATERIALS, UNLESS NOTED <br />OTHERWISE. <br />13 <br />DEMOLISH AND DISPOSE OF EXISTING TOILET ROOM ACCESSORIES. PATCH AND <br />REPAIR WALLS AS NECSSARY TO ACCOMMODATE NEW WORK. <br />iq EXISTING DRINKING FOUNTAIN TO REMAIN. PROTECT THROUGHOUT THE <br />DURATION OF CONSTRUCTION. <br />DESIGN JPC <br />i6 <br />DEMOLISH AND DISPOSE OF EXISTING PLUMBINGIFIXTURES. TERMINATE AND CAP <br />DRAWN NB/AG <br />ALL EXISTING SUPPLYNJASTE LINES BEHIND WALLS AND/OR FLOOR, PATCH AND <br />REPAIR AFFECTED AREA, INCLUDING BUT NOT LIMITED TO WALLS, FLOOR, AND <br />CHECKED TP <br />CEILINGS AS REQUIRED. <br />NO. 22-0799 <br />16 <br />DEMOLISH ELECTRICAL, LOW VOLTAGE AND LIFE SAFETY EQUIPMENTIDEVICES <br />(INCLUDING LOW VOLTAGE CABLING) AS REQUIRED FOR NEW CONSTRUCTION. <br />LOW/LINE VOLTAGE CABLING/WIRING SHALL BE TERMINATED (REMOVED) PER <br />MOST CURRENT ISSUE OF APPLICABLE BUILDING CODES. REFER TO FLOOR PLAN <br />FOR ADDITIONAL INFORMATION. <br />17 <br />EXISTING ELEVATOR TO REMAIN. PROTECT THROUGHOUT THE DURATION OF <br />CONSTRUCTION. <br />ig <br />EXISTING STAIR TO REMAIN. PROTECT THROUGHOUT THE DURATION OF <br />CONSTRUCTION. <br />REFER TO DEMO NOTES ON SHEET 1-0.1. <br />REFER TO OVERALL PLANS ON SHEET <br />DEMOLITION PLAN LEGEND: <br />EXISTING PARTITION/CONSTRUCTION TO REMAIN <br />= = = EXISTING PARTITION TO BE REMOVED <br />—SR <br />ERED <br />ECT <br />MARK PETERSON <br />STATE OF WASHINGTON <br />02-17-2023 PERMIT SET <br />2ND FL DEMOLITION <br />PLAN <br />1-1.2 <br />2023.-ARCHITECTS.LLC <br />