My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:53:14 PM
Creation date
8/24/2023 9:02:54 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINISH NOTES <br />1. 'ALL AREAS TO RECEIVE CARPET AND BASE AS SCHEDULED U.N.O. <br />2. ALL AREAS TO RECEIVE RB-1 U.N.O. <br />3. ALL WALLS & PARTITIONS TO RECEIVE P-1 U.N.O. U <br />III IIII 4. PREP ALL EXISTING FLOOR SURFACES TO RECEIVE NEW FINISHES AS ■ ■ <br />SCHEDULED. � 1 1 <br />'J LJ 1 '` 5. PROVIDE PAINT APPLICATION APPROPRIATE TO THE SUBSTRATE TO <br />III <br />TI G M ME 11 M WHICH IT IS TO BE AP PLIED. IIII 133A 113-M,3E� <br />III III III III III III III III 6 ALL EXPOSED GYP BD SURFACES BOTH EXISTING AND NEW, ARE TO <br />� f RECEIVE NEW PAINT FINISH PREP ALL SURFACES AS REQUIRED FOR <br />P NEW PAINT FINISH. PROVIDE ONE PRIME COAT PLUS TWO FINISH N <br />Yf 11 III .I J P J COATS <br />II II II 3 7. CHANGES IN FLOOR MATERIALS THAT OCCUR AT FRAMED DOOR U1 j <br />OPENINGS SHALL OCCUR AT THE CENTERLINE OF THE DOOR IN THE w <br />CLOSED POSITION. /� Z <br />ELECTRICAL SWITCH GEAR P M� ; R� e. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME - �I j CD <br />RETARDANT TREATED IN AN APPROVED OF MANNER (CURTAINS, \ C 0, <br />L1 N III DRAPES, SHADES, HANGINGS, ETC.) j a <br />9. ALL INTERIOR PARTITIONS, CEILING FINISHES AND TRIM OF PUBLIC Q <br />AREAS TO COMPLY WITH CLASS 1 MATERIAL CLASSIFICATION; FLAME t <br />ELECTRIC SPREAD RATING 0 TO 25, SMOKE DEVELOPED 200. ALL INTERIOR WALL N y <br />O - P AND CEILING FINISHES AND TRIM OF NON-PUBLIC AREAS TO COMPLY > <br />126 127 T POI T 4 WITH CLASS 2 MATERIAL CLASSIFICATION; FLAME SPREAD RATING 26 y <br />130 TO 75, SMOKE DEVELOPED 450. Ppp <br />O m <br />Q RE EPTIO - 10. FLOOR COVERINGS OF PUBLIC AREAS TO MEET CLASS A INTERIOR <br />m m m 132 100 LOOR FINISH REQUIREMENTS; PER SQUARE CENTIMETER OR HIGHER, RADIANT FLUX OF 5 WATTS <br />FLOOR COVERINGS OF <br />OFFICE 2 NON-PUBLIC AREAS TO MEET CLASS B INTERIOR FLOOR FINISH <br />PT 'S / REQUIREMENTS; CRITICAL RADIANT FLUX BETWEEN 0.22 WATTS PER <br />124 0_ RE 129 M SQUARE CENTIMETER AND 0.44 WATTS PER SQUARE CENTIMETER. ZAP E N E RG Y <br />ELEV 11. CARPET INSTALLATION TO MEET THE GUIDELINES OF THE CARPET AND <br />RUG INSTITUTE-CRI CARPET INSTALLATION STANDARD -CURRENT Opus Seaway <br />R RBGUG EDITION. <br />__ HGGT o 0 0 o Floor 1& 2 <br />u.N.o. 12. PROVIDE FINISHED SCRIBE STRIPS AND FINISHED MILLWORK EDGES TO <br />OFFICE CREATE A FINISHED REVEAL CONDITION WHERE MILLWORK COUNTERS, 2300 Merrill Creek Pkwy <br />OPEN OFFIC 0 Q JAN CABINETS, ETC. "ABUT' ADJACENT PARTITION CONSTRUCTION. ALL <br />,23 Everett, WA <br />B 125 P 131 LAM NATFINISH AS D RETHE CASEWORK ITEM THEY SURFACES <br />HAVE SAME PLASTIC <br />2Ll PT 'S <br />1 OOM 13, CONTRACTOR TO CLEAN AND REPAIR ALL EXISTING EXTERIOR GLAZING <br />ipg AND INTERIOR RELITE MINI -BLINDS WITHIN THE WORK AREA. <br />OFFICE 2 o OPEN OFFICE ®®® 191 REFER TO SHEET 6.1 FOR FINISH SPECIFICATIONS. <br />1zz 1 11s <br />ELEC DESIGN JPC <br />117 I DRAWN NB/AG <br />L1 CHECKED TP <br />PRINT NO. 22-0799 <br />OFFICE <br />OFFICE ® ®, <br />11 <br />/,N 1st FLOOR FINISH PLAN - AREA A <br />1 . SCALE: 1/8"=1'-0" <br />FUTURE LAB <br />0 <br />1 <br />RI I 1 <br />1 1 1 11 GI1 <br />N 3 <br />PRINT <br />O <br />O <br />IIII11 106 I11111 <br />PT <br />O PT <br />IIIIIII I <br />WOMEN'S <br />RESTROOM <br />MEWS <br />RESTROOM <br />114 <br />107 <br />115 <br />STORAGE <br />113 <br />CORRIDOR <br />112 <br />tv1 ETI�JG M <br />111 <br />i P <br />3 <br />OFFICE 2 OPEN OFFICE <br />110 108 ®p <br />1 <br />OFFICE <br />109 e 2 <br />I <br />1st FLOOR FINISH PLAN - AREA B <br />SCALE: 1/8"=V-0" <br />3339 REGISTERED <br />•//'/.A� ECT <br />MARKA PETERSON <br />STATE OF WASHINGTON <br />02-17-2023 PERMIT SET <br />1ST FL FINISH PLAN <br />1-6.1 <br />2023.—ARCHITECTS.— <br />
The URL can be used to link to this page
Your browser does not support the video tag.