My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:53:14 PM
Creation date
8/24/2023 9:02:54 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TCOMPRESSION <br />STRUTS <br />ATTACHED WALL <br />t8" MAX. <br />AND LATERAL BRACING BE <br />B B B B B <br />B <br />TO BE LOCATED 6'-0" <br />MAX E.W. FROM WALLS <br />AND DISCONTINUOUS <br />L1 <br />L1 <br />SEISMIC PERIMETER <br />CEILING SURFACES <br />2 CLOSURE AT SEISMIC <br />CENTER SMALL <br />A <br />Ti <br />192 CATEGORYC,D,E,F <br />7/8" •l <br />PENETRATIONS WITHIN <br />.X" <br />UNATTACHED WALLS <br />THE CEILING GRID; <br />SEISMIC JOINTS WHERE <br />3 <br />CAN USE BERK CLIP OR <br />STABILIZER <br />EVENLY SPACE T <br />102 REQUIRED TO LIMIT CEILING <br />POP RIVET NOTED AS <br />BAR OR OTHER SUITABLE <br />MULTIPLE-92 <br />AREAS TO 2500 SF <br />'g/p' ON 1/-9.2 FOR <br />.d <br />SYSTEM TO KEEP PERIMETER <br />PENETRATIONS <br />COMPRESSION STRUTS AND <br />CATEGORY D,E,F <br />COMPONENTS FROM <br />WITHIN A SINGLE GRID <br />Ll <br />Ll <br />92 LATERAL BRACING WHERE <br />SPREADING APART <br />MODULEk,2CEILING <br />AREA > 144 SF <br />HANGER WIRE AT EACH <br />"HEAVY-DUTY'CEILING <br />5 12 GA VERTICAL HANGER <br />PERIMETER MAIN TEE <br />192 WIRES TO CEILING GRID <br />AND PER <br />8-mAX <br />SUPPORT SYSTEM <br />MAIN BEAMS ATIP O.C. <br />CROSS TEE <br />SIMILAR TO 3 <br />EACH WAY WITH 3 TIGHT <br />< <br />ARM STRONG SEISMIC o <br />WRAPS <br />TYPICAL WALL MOULDING <br />RX FOR SEISMIC DESIGN <br />PER SCHEDULE. <br />CATEGORY'D, E, OR F' <br />PER IBC 1613.1 G <br />Eff <br />.2 <br />TYPICAL HEAVY DUTY <br />OFF MODULE MAIN <br />BEAMS TO USE STAC <br />CEILING GRID FIXTURE <br />7/8' SUSPENDED CEILING <br />CLIP <br />UNATTACHED WALL <br />4 BRACING AT ELECTRICAL <br />GRID SYSTEM PER SCHEDULE <br />-9.P AND MECHANICAL ATTACHED WALLS AT CATEGORY D, <br />FIXTURES E & F USE BERC2 BY ARMSTRONG <br />OR EQ. CEILING NOTED AS'B' ON 1/ <br />1-9.2, CATEGORY C ALWAYS USES <br />BERC2 <br />10 CEILING — APC — DIAGRAM O CEILING — APC — PERIMETER SUPPORT <br />SCALE: 3"=I'W SCALE:1 112"=1'-0" <br />NOTES: <br />1. LATERAL BRACING CLUSTER: (4)12 GA. GALV. SOFT -ANNEALED MILD STEEL WIRES SECURED TO MAIN RUNNER WITHIN T OF <br />CROSS'T' AND SPLAYED 90 DEGREES FROM EACH OTHER AT 45 DEGREES MAX. ABOVE HORIZONTAL. CLUSTERS PLACED (E) CONCRETE (E) CONCRETE <br />12'-0" O.C. MAX. AND M" MAX. FROM EACH WALL. WIRES SHOULD BE TAUT WITHOUT CAUSING CEILING TO LIFT. OVER METAL DECK OVER METAL DECK <br />2. SUSPENSION WIRE: 12 GA. GALV. SOFT -ANNEALED MILD STEEL WIRE ENCASED IN 12" DIAM. CONDUIT (FOR UPLIFT RESTRAINT); <br />SECURE WIRE TO MAIN RUNNER WITHIN 2" OF CROSS T'. CONDUIT TO OCCUR AT EVERY LATERAL BRACING CLUSTER AND _ <br />SUSPENSION WIRES TO OCCUR AT 4'-0" O.C. MAX. EACH WAY. Q Q <br />3 TURNS MIN. <br />WITHIN 3" TYP. <br />NOTE #1 — <br />COMPRESSION <br />STRUT (NOTE #2) <br />NOTE#1 CEILING CI <br />ANCHORAI <br />ASCE 7-10 <br />ASTM E58( <br />45°MAX. TYP. <br />RUNNER ENDSAT <br />(3)TURNSWITHIP <br />OPPOSITE WALLS <br />1-1/2" OF END <br />MAIN RUNNER, 2" MAX. TYP. <br />TO FLOAT FREE <br />OF WIRE <br />HEAVY DUTY <br />ON PERIMETER <br />CROSS T" <br />ANGLE. PROVIDE <br />SEISMIC BRACE <br />3/4, CLEARANCE <br />WIRE <br />VIEW SHOWING LATERAL BRACING <br />BETWEEN ENDS OF <br />GRID & WALL <br />CLUSTER AND SUSPENSION WIRE <br />0 CEILING — APC — BRACING DIAGRAM <br />SCALE: <br />0 <br />54 MIL SIMPSON <br />SJC10.25 W/ (2)1/4" 0 <br />HILTI KH EZ TO DECK <br />400S1 2-33 @ 48" OC <br />MAX W/ (3) #12 EA END <br />CEILING <br />PER RCP <br />4 <br />CEILING CLIP W/ J <br />ANCHORAGE PER (2) #8 SCREWS <br />ASCE 7-10 AND <br />ASTM E580 <br />COMPRESSION <br />STRUT PER <br />511-9.2 <br />(K)CEILING — APC — SEISMIC WIRE/COMP STRUT <br />SCALE: 3" =1'4' <br />INCRETE DECK, MIN. 3.25" ---- - --- -- --- a <br />8" MAX. <br />OD. <br />8" MAX <br />a o9 ' <br />d <br />PROVIDE CEILING SEISMIC JOINT CLIP IN MAIN <br />BEAMS SIMILAR TO ARMSTRONG SJMR AS <br />NO, 9 GA. LATERAL SUPPORT WIRE WITHIN 3" <br />OF EACH CORNER OF LIGHT FIXTURE. SPLAY <br />WIRES AS SHOWN AND FASTEN TO BEAM OR <br />PURLIN. MIN. OF 3 WIRE TURNS EACH. <br />CONNECTION POINT <br />NO.9 GA. LATERAL SUPPORT WIRE AT <br />CENTER ENDS OF EA. FIXTURE. FIXTURE <br />SUPPORT WIRE SUPPLIED BY CEILING <br />CONTRACTOR 0 <br />TYP. <br />NECESSARY DIVIDING CEILING INTO AREAS NO <br />\ FIXTURE <br />g � GREATER THAN 2,500 S.F. <br />CROSS TIE <br />MAIN STRUCTURAL <br />RUNNER4'-0" O.C. <br />O3 <br />CEILING — APC — EXPANSION JOINT (>2500 SF) <br />4O <br />CEILING — APC — LIGHT FIXTURE BRACING <br />SCALE: 3" =1'-0- <br />SCALE: N.T.S. <br />rEM PENETRATING CEILING SHALL BE <br />;UPPORTED AND SEISMICALLY BRACED <br />VDEPENDENT OF CEILING <br />:EILING PANEL AS SCHEDULED <br />:SCUTCHEON ATTACHED TO ITEM <br />OCEILING — APC — PENETRATION DETAIL <br />SCALE: <br />ICKNESS <br />CONCRETE DECK, MIN. 3.25" <br />.L VOID WITH ACOUSTICAL o <br />THICKNESS <br />ALANT BOTH SIDES <br />FILL VOID WITH <br />ACOUSTICAL SEALANT <br />IP TRACK W/ (2)1/4" 0 10 1/4" <br />q5 <br />BOTH SIDES <br />.TI KH EZ @ 24" OC & (2) <br />TOP TRACK W/ (2)1/4" 0 <br />38" 0 HILTI X-C @ 24" OC 54 MIL SIMPSON <br />HILTI KH EZ @ 24' OC & (2) <br />SJC10.25 W/ (2)1/4" 0 <br />HILTI KH EZ TO DECK <br />r <br />0.138"OHILTI X-C @24"OC <br />ONE LAYER 518" GWB 4006162-33 @ 48" OC J \ <br />MAX WI (3) #12 EA END o <br />FRAMING PER LIMITING <br />HEIGHTS SCHEDULE. w <br />ALUM. FRAME AND <br />GLAZING WHERE <br />OCCURSPER PLAN. <br />GLAZED HEADER DESIGN <br />STUD WIDTH <br />(IN.) <br />MAX GLAZING <br />HEIGHT (FT) <br />MAX HEADER <br />HEIGHT (FT) <br />MAX BRACE <br />OFFSET (FT) <br />STUD DESIGN <br />@ 24" OC <br />2.5 <br />8 <br />5 <br />1 <br />25OS125-27 <br />2.5 <br />8 <br />5 <br />3 <br />250S162-43 <br />2.5 <br />10 <br />5 <br />1 <br />250S125-30 <br />2.5 <br />10 <br />5 <br />3 <br />250S162-54 <br />3.625 <br />8 <br />6 <br />1 <br />362S125-27 <br />3.625 <br />8 <br />6 <br />3 <br />362S162-43 <br />3.625 <br />10 <br />6 <br />1 <br />362S125-30 <br />3.625 <br />10 <br />6 <br />3 <br />362S162-43 <br />6 <br />8 <br />7 <br />2 <br />60OS125-30 <br />6 <br />8 <br />7 <br />4 <br />600S162-43 <br />6 <br />10 <br />7 <br />2 <br />60OS125-33 <br />6 <br />10 <br />7 <br />4 <br />60OS162-43 <br />g l 9 1 GWB HEADER TO STRUCTURE AT GLAZING <br />ogCEILING _ <br />PER RCP <br />ONE LAYER 5l8" GWB <br />FRAMING PER LIMITING <br />HEIGHTS SCHEDULE. <br />OPEN HEADER (NO WALLIGLAZING BELOW) DESIGNS <br />STUD WIDTH <br />(IN.) <br />MAX HEADER <br />HEIGHT (FT) <br />MAX BRACE <br />OFFSET (FT) <br />STUD DESIGN <br />@ 24" OC <br />2.5 <br />5 <br />1 <br />250S125-27 <br />2.5 <br />5 <br />3 <br />250S125-33 <br />3.625 <br />6 <br />1 <br />362S125-27 <br />3.625 <br />6 <br />3 <br />362S125-27 <br />6 <br />7 <br />2 <br />60OS125-30 <br />6 <br />7 <br />4 <br />600S125-30 <br />;AFT CABLE <br />;AFT CABLE <br />ACOUSTIC FELT <br />BAFFLE <br />2'-0" TYP. <br />1 11 1 CEILING — APC — PENETRATION FDETAIL <br />-- SCALE: <br />UMOVEABLE PARTITION HEAD <br />SCALE: <br />0 <br />N <br />In <br />W <br />Z <br />O <br />7 00 <br />N O" <br />Q <br />L <br />ZAP ENERGY <br />Opus Seaway <br />Floor 1 & 2 <br />2300 Merrill Creek Pkwy <br />Everett, WA <br />DESIGN JPC <br />DRAWN NB/AG <br />CHECKED TP <br />NO. 22-0799 <br />3339 REGISTERED <br />•//'/�/�1A� ECT <br />MARKA PETERSON <br />STATE OF WASHINGTON <br />02-17-2023 PERMIT SET <br />CEILING DETAILS <br />1-9.2 <br />a I \--/ SCALE: <br />1 n 1 GWB HEADER TO STRUCTURE - OPEN <br />SCALE: <br />2023.—ARCHITECTS.LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.