My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:53:14 PM
Creation date
8/24/2023 9:02:54 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Wednesday, March 8, 2023 9:17 AM <br /> To: Colie Wilson <br /> Subject: City of Everett Permit Services:2300 Merrill Creek Parkway(M2303-001) - First Building <br /> Review <br /> Hello, Colie. <br /> Your application has been received and a permit set up. However,the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Construction-level documents should be submitted for review. Two complete sets of the revised drawings <br /> should be submitted to replace the previously submitted drawing sets. Preliminary comments are provided <br /> below to assist in preparing the drawings, but these are not intended to provide a comprehensive review. The <br /> resubmittal documents should include an itemized response letter clarifying how the review comments below <br /> have been addressed. <br /> Intake Review Comments: <br /> 1. Drawings for the interior design prepared by the architect have been submitted. Mechanical drawings <br /> are required to be submitted in order to issue a mechanical permit. Please submit drawings showing <br /> the proposed mechanical work. <br /> 2. The drawings should include a schedule of all equipment proposed in the project. Weights for each <br /> unit should be specified. Where new units are replacing old units, the weights of both the old and new <br /> units should be specified. <br /> 3. If installation of new units requires substantial structural modifications to the supporting framing, a <br /> building permit will be required. The application should include drawings and calculations for the <br /> proposed modifications. Minor modifications (e.g., blocking between existing framing, curbs, <br /> sheathing penetrations that do not cut framing members) may be performed within the scope of the <br /> mechanical permit application. <br /> 4. If the new units are suspended, details and calculations for the gravity supports and lateral bracing of <br /> the unit is required if it exceeds 20 lbs. See IBC Section 1613.1 and ASCE 7-16 Chapter 13. <br /> 5. Details will be required when penetrating fire-rated assemblies;the applicant is responsible to <br /> evaluate the building and determine the Construction Type of the building per IBC Section 601, and the <br /> locations and ratings of assemblies. Penetration details should be provided for the rated assemblies <br /> per IBC Chapter 7. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> NuAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2"d Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm &1 pm—3 pm;Tu: 1:O0pm-3:0Opm <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.