My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY ZAP ENERGY 2023-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:53:14 PM
Creation date
8/24/2023 9:02:54 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL LETTER REPORT <br />Report Number: M7231156.0004 <br />Service Date: 05/23/23 <br />Report Date: 05/24/23 <br />Client <br />Zap Energy Inc <br />Attn: Julie Yinger <br />506 2nd Ave Ste 1400 <br />Seattle, WA 98104-2329 <br />City of Everett <br />Building Division <br />3200 Cedar <br />Everett, WA 98201 <br />MAYES I 1rerracon <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Zap OPUS TI Steel Bridge and Stairs <br />2300 Merrill Creek Pkw <br />Everett, WA <br />Project No.: M7231156 <br />Final Letter <br />Permit No: B2302-100 <br />This is to advise you that registered special inspections have been completed for the project referenced above per <br />our reports, copies of which have been sent to you. <br />Special inspection was provided for: <br />• Post -Installed Adhesive Anchors Observations <br />• Structural Steel Observations <br />To the best of our knowledge, all work inspected was either performed in accordance with, or corrected to conform <br />to, the city -approved drawings or engineer -approved changes. <br />We trust this provides you with the information you require. Should you have any questions, please contact us at <br />(425) 742-9360. <br />Michael Mattox <br />Senior Project Field Manager <br />Services: Project Management <br />Mayes/Terracon Rep.: Michael Mattox <br />Reported to: Trico <br />Contractor: Trico <br />Report Distribution: <br />(1) Zap Energy Inc, Julie Yinger <br />(1) JPC Architects LLC, Anna Griffith <br />(1) Mayes Testing Engineers, Inc, <br />Mike Mattox <br />Kevin Graham <br />Department Manager <br />(1) City of Everett WA, Permit Services <br />(1) Mayes Testing Engineers, Inc, <br />Donna Pollard <br />(1) Zap Energy Inc, Steve Zwaller <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client <br />indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br />the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />CT0001, 10-16-13, Rev.10 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.