,TI O
<br />GENERAL NOTES:
<br />9
<br />REFLECTED CEILING NOTES:
<br />1. COORDINATE THE WORK OF ALL TRADES INVOLVED IN THE CEILING
<br />WORK TO ENSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING
<br />SUSPENSION SYSTEM, ETC., NECESSARY TO MAINTAIN THE FINISHED
<br />CEILING HEIGHTS INDICATED ON ARCHITECTS DRAWINGS.
<br />2. PERIMETER CEILING ANGLE, WHERE OCCURS, SHALL BE INSTALLED TIGHT
<br />TO VERTICAL SURFACES, FREE FROM CURVES, BREAKS OR OTHER
<br />IRREGULARITIES AND PAINTED TO MATCH CEILING FINISH.
<br />3. FURNISH AND INSTALL ALL ASSOCIATED TRIM AND SEISMIC BRACING AS
<br />REQUIRED.
<br />4. LIGHT FIXTURES, NEW SPRINKLERS AND OTHER CEILING ELEMENTS
<br />SHALL BE CENTERED IN THE 2'X2' SECTION OF INDIVIDUAL CEILING TILES
<br />U.N.O. (EXIST. SPRINKLERS TO REMAIN UNLESS CONFLICT WITH NEW
<br />ELEMENTS).
<br />5. PROVIDE CEILING ACCESS AS REQUIRED FOR EQUIPMENT AND SYSTEM
<br />MAINTENANCE, AND MATCH ADJACENT CEILING FINISH U.N.O.
<br />6. ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF
<br />FINISHED FLOOR TO BOTTOM OF FINISHED GYPSUM BOARD OR CEILING
<br />TILE AND SHALL ALLOW FOR THICKNESS OF ALL FLOOR FINISHES.
<br />7. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING
<br />HEIGHTS, LIGHT TYPES, LIGHT FIXTURES, AND ASSOCIATED ITEMS.
<br />8. ALL SPECIFIC INFORMATION CONCERNING INSTALLATION FOR VARIOUS
<br />ABOVE -CEILING ELEMENTS ARE TO BE DESIGN BUILD, DOCUMENTATION
<br />BY OTHERS - PERMITTED SEPARATELY.
<br />9. NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS
<br />WITH MAIN RUNNERS, DUCTS, STRUCTURES, HVAC, AND/OR (E)CONDUIT,
<br />PRIOR TO FRAMING FOR LIGHTS. ANY DISCREPANCIES BETWEEN
<br />ARCHITECT'S CEILING GRID LOCATION& ACTUAL FIELD CONDITIONS ARE
<br />TO BE CLARIFIED WITH THE ARCHITECT PRIOR TO FRAMING.
<br />10. SUBMIT GRILLE, THERMOSTAT, AND OTHER FIXTURE AND ELEMENT
<br />LAYOUTS TO THE ARCHITECT FOR REVIEW AT LEAST 2 WEEKS PRIOR TO
<br />INSTALLATION.
<br />11. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING,
<br />MECHANICAL DUCTS, STRUCTURAL ELEMENTS AND ALL OTHER RELATED
<br />ITEMS. INSTALL NEW PLUMBING, MECHANICAL, FANS, DUCTS, CONDUITS,
<br />AND OTHER RELATED ITEMS SO AS TO NOT CONFLICT WITH ANY/ALL FIELD
<br />CONDITIONS INCLUDING LUMINAIRES.
<br />12. INSTALL NEW LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR COVER
<br />OVER LOUVER, LENS, BAFFLE, ETC. TO AVOID FIXTURE SOILING OR
<br />DAMAGE. FIXTURES SHALL BE MAINTAINED CLEAN AND AS NEW. ALL
<br />LAMPS SHALL BE NEW AT PROJECT COMPLETION-RELAMP EXISTING
<br />FIXTURES.
<br />13. CONTRACTOR TO VERIFY CODE COMPLIANCE OF EXISTING ACOUSTICAL
<br />CEILING GRID SYSTEMS AND ASSOCIATED SEISMIC BRACING RESTRAINTS.
<br />SYSTEMS FOUND NOT IN COMPLIANCE SHALL BE MODIFIED ANDIOR NEW
<br />PROVIDED AS REQUIRED BY CURRENT BUILDING CODES (INCLUDING, BUT
<br />NOT LIMITED TO; CURRENT IBC WALL MOLDING (2" ANGLE) AND SEISMIC
<br />SEPARATION JOINTS).
<br />14, CONTRACTOR TO VERIFY CODE COMPLIANCE OF ALL EXISTING LIGHTING
<br />FIXTURES AND ASSOCIATED SEISMIC BRACING RESTRAINTS. FIXTURES
<br />FOUND NOT IN COMPLIANCE SHALL BE MODIFIED AND/OR NEW PROVIDED
<br />AS REQUIRED BY CURRENT BUILDING AND/OR ENERGY COMPLIANCE
<br />CODES.
<br />15. ALL EXITING LIGHTS AND EGRESS LIGHTING LOCATIONS SHALL BE
<br />DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT
<br />DETERMINATION.
<br />16. ALL SMOKE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH IMC/IBC
<br />OR SUPERCEDING CODE. ALL FIRE DAMPERS SHALL BE INSTALLED IN
<br />ACCORDANCE WITH IMC/IBC OR SUPERCEDING CODE.
<br />DEMOLITION NOTES:
<br />1. OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS OF SAME IN
<br />CONTRACT PRICE.
<br />2. FURNISH ALL LABOR AND MATERIALSIEQUIPMENT TO COMPLETE
<br />DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED.
<br />3. CONTRACTOR SHALL KEEP CONSTRUCTION AREA FREE OF DUST AND
<br />DEBRIS FOR THE DURATION OF CONSTRUCTION.
<br />4. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY
<br />THE POINT IN QUESTION WITH THE ARCHITECT BEFORE PROCEEDING.
<br />5. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S)
<br />SHALL BE LEFT IN "BROOM CLEAN" CONDITION. ALL DEBRIS AND
<br />MISCELLANEOUS MATERIAL SHALL BE REMOVED.
<br />6. ALL DEBRIS REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH
<br />BUILDING MANAGEMENT REQUIREMENTS AND PROCEDURES.
<br />7. AS DIRECTED BY BUILDING MANAGEMENT, ALL DOORS, FRAMES,
<br />HARDWARE, MECHANICAL ITEMS, PLUMBING FIXTURES, LIGHT FIXTURES
<br />(INCLUDING DOWNLIGHTS AND FLUORESCENTS), AND SPECIAL EQUIPMENT
<br />SHOWN TO BE REMOVED, SHALL BE CLEAN AND FREE OF DEFECTS,
<br />PROTECTED, SAVED AND REUSED AS DIRECTED HEREIN, OR RETURNED TO
<br />BUILDING STOCK.
<br />8. IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL OUTLETS,
<br />SWITCHES, WIRES, THERMOSTATS, ETC., TO THEIR SOURCE.
<br />9. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING
<br />ANY DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS TO EXISTING
<br />CONSTRUCTION IN ELEVATOR LOBBY, PUBLIC CORRIDORS, RESTROOMS
<br />OR TENANT SPACES. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR
<br />AS NOTED HEREIN.
<br />10. NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM
<br />BOX OR SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING SHALL BE
<br />DAMAGED DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION.
<br />RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND
<br />FIRE ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL
<br />BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS. NO ACTIVE
<br />SMOKE DETECTOR SHALL BE COVERED OR OTHERWISE REMOVED OR
<br />USED FOR OTHER THAN ITS INTENDED PURPOSE.
<br />11. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT
<br />PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE
<br />VERIFIED WITH TELEPHONE COMPANIES AND TENANT.
<br />12. REMOVE ALL EXISTING MATERIALS WHICH WOULD CAUSE RISES OR
<br />DEPRESSIONS IN NEW FLOORING SURFACE, SUCH AS FASTENERS, OUTLET
<br />CORES, COVER PLATES, RESILIENT FLOOR COVERINGS, CARPET, CARPET
<br />PAD, FLASH PATCH, CONCRETE FILL, PLYWOOD, ETC.
<br />13. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON
<br />DRAWINGS. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF
<br />DEMOLITION REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH
<br />THE CONTRACT DRAWINGS.
<br />14. RATED WALLS SHALL NOT BE PENETRATED UNLESS THE RATING IS
<br />MAINTAINED.
<br />15. DISPOSAL: ALL DEBRIS REMOVED FROM THE SITE SHALL BE RECYCLED AS
<br />MUCH AS PRACTICAL AND ALLOWED BY LAW.
<br />A/C AIRCONDITIONING
<br />ACT ACOUSTICAL CEILING TILE
<br />AFF ABOVE FINISH FLOOR
<br />AHJ AUTHORITIES HAVING JURISDICTION
<br />ALT. ALTERNATE
<br />APPROX. APPROXIMATE
<br />BD BOARD
<br />BLDG BUILDING
<br />BLK BLOCK
<br />BLKG BLOCKING
<br />BOT BO OM
<br />BIS BUILDING STANDARD
<br />BU BUILT UP
<br />CAB CABINET
<br />CLG CEILING
<br />CLR CLEAR(ANCE)
<br />COL COLUMN
<br />CONC CONCRETE
<br />CONS CONSTRUCTION
<br />CONT CONTINUOUS
<br />CORR CORRIDOR
<br />CPT CARPET
<br />CT CERAMICTILE
<br />CTR CENTER
<br />DEMO DEMOLITION
<br />DTL DETAIL
<br />OF D INKING FOUNTAIN
<br />DIA DIAMETER
<br />DIM DIMENSION
<br />ON DOWN
<br />DR DOOR
<br />DWG DRAWING
<br />DRW DRAWER
<br />E EAST
<br />EA EACH
<br />EL ELEVATION
<br />ELEC ELECTRICAL
<br />ELEV ELEVATOR
<br />EQ EQUAL
<br />EQUIP EQUIPMENT
<br />EST ESTIMATE
<br />EXIST EXISTING
<br />EXP EXPANSION
<br />FEC
<br />FIREEXTINGUISHERCABINET
<br />FF
<br />FACTORYFINISH
<br />FH
<br />FULL HEIGHT
<br />FIN
<br />FINISH(ED)
<br />FUR
<br />FLOOR
<br />FLUOR
<br />FLUORESCENT
<br />FDIC
<br />FURNISH BY OWNER,
<br />INSTALL BY CONTRACTOR
<br />FOS
<br />FACE OF STUD(S)
<br />FOC
<br />FACE OF CONCRETE
<br />FOF
<br />FACE OF FINISH
<br />FT
<br />FUR
<br />FOOTIFEET
<br />FURREDIFURRING
<br />GA GAUGE
<br />GC GENERA -CONTRACTOR
<br />GL GLASS/GLAZING
<br />GM GYPSUM WALL BOARD
<br />HC HOLLOWCORE
<br />HCPD HANDICAPPED
<br />HDR HEADER
<br />HOW R HARDWARE
<br />HM HOLLOWMETAL
<br />HORIZ HORIZONTAL
<br />HR HOUR
<br />HT HEIGHT
<br />HVAC HEATING VENTILATING
<br />AIR CONDITIONING
<br />1 `u�YN�19.Y1JJ1[L
<br />JAN JANITOR
<br />JT JOINT
<br />KIT KITCHEN
<br />LAM LAMINATE(D)
<br />LAV LAVATORY
<br />LH LEFT HAND
<br />MAX MAXIMUM
<br />MECH MECHANICAL
<br />NIL METAL
<br />MEZ MEZZANINE
<br />MFR MANUFACTURE(R)
<br />MIN MINIMUM
<br />MISC MISCELLANEOUS
<br />MTD MOUNTED
<br />MUL MULLION
<br />N NORTH
<br />NIC NOT IN CONTRACT
<br />NTS NOT TO SCALE
<br />CA OVERALL
<br />OC ON CENTER
<br />OD OUTSIDE DIAMETER
<br />OH OPPOSITE HAND
<br />OPNG OPENING
<br />P-LAM PLASTIC LAMINATE
<br />PNL PANEL
<br />PR PAIR
<br />PTN PARTITION
<br />PAD RADIUS
<br />RB RESILIENT BASE
<br />FIT RESILIENTTILE
<br />REF REFERENCE
<br />REFR REFRIGERATOR
<br />REINF REINFORCING
<br />REQ REQUIRED
<br />REV REVISION
<br />FIN RIGHT HAND
<br />RM ROOM
<br />RO ROUGH OPENING
<br />S SOUTH
<br />SC SOLID CORE
<br />SEAL SEALANT
<br />SECT SECTION
<br />BHT SHEET
<br />SIM SIMILAR
<br />SPEC SPECIFICATION
<br />SQ SOLARE
<br />SS STAINLESS STEEL
<br />STL STEEL
<br />STOR STORAGE
<br />STIR C STRUCTURAL
<br />SUSP SUSPENDED
<br />TEL TELEPHONE
<br />TEMP TEMPERED
<br />TFTI TENANT FURNISHED
<br />& TENANT INSTALLED
<br />THK THICK(NESS)
<br />THRESH THRESHOLD
<br />TV TELEVISION
<br />TYP TYPICAL
<br />UNFIN UNFINISHED
<br />UNO UNLESS NOTED OTHERWISE
<br />VCT VINYL COMPOSITION TILE
<br />VEN VENEER
<br />VERT VERTICAL
<br />VESTI VESTIBULE
<br />VFY VERIFY
<br />VWC VINYL WALL COVERING
<br />W WESTANIDE
<br />wl WITH
<br />WD WOOD
<br />W/o WITHOUT
<br />WR WEIGHT
<br />1. REFER TO BASIC BUILDING SPECIFICATIONS, REQUIREMENTS AND STANDARDS FOR EXISTING
<br />SHELL AND CORE CONSTRUCTION. ALL WORK IS TO BE COMPATIBLE WITH EXISTING
<br />CONSTRUCTION.
<br />2. ALL WORK SHALL CONFORM TO APPLICABLE CURRENT FEDERAL, STATE AND LOCAL CODES. THE
<br />CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATION OF AND COORDINATION WITH
<br />CITY AND STATE AGENCIES, AND PROVIDE REQUIRED PERMITS. ALL TESTS AND INSPECTIONS
<br />ASSOCIATED WITH OBTAINING APPROVALS TO PROCEED WITH AND COMPLETE THE WORK SHALL
<br />BE PAID FOR BY THE CONTRACTOR.
<br />3. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS,
<br />EQUIPMENT AND TRANSPORTATION NECESSARY OR REASONABLY INFERABLE AS BEING
<br />NECESSARY FOR THE EXECUTION OF THE WORK. BY SUBMITTING A PROPOSAL, THE CONTRACTOR
<br />REPRESENTS THAT THOROUGH EXAMINATION OF THE SITE AND ALL EXISTING CONDITIONS AND
<br />LIMITATIONS HAVE BEEN MADE AND THAT THE CONTRACT DOCUMENTS HAVE BEEN EXAMINED IN
<br />COMPLETE DETAIL, AND THAT IT IS DETERMINED BEYOND DOUBT THAT THE DRAWINGS,
<br />SPECIFICATIONS AND EXISTING CONDITIONS ARE SUFFICIENT, ADEQUATE AND SATISFACTORY FOR
<br />CONSTRUCTION OF THE WORK. WHERE MINOR ADJUSTMENTS TO THE WORK ARE NECESSARY
<br />FOR THE PURPOSES OF FABRICATION AND INSTALLATION OF ITEMS, OR RESOLUTIONS OF
<br />CONFLICTS BETWEEN ITEMS, WITHIN THE INTENT OF THE CONTRACT DOCUMENTS, THE
<br />CONTRACTOR SHALL MAKE SUCH ADJUSTMENTS AT NO ADDED EXPENSE TO THE OWNER. WHERE
<br />SUCH MINOR ADJUSTMENTS AFFECT FUNCTIONAL OR AESTHETIC DESIGN OF THE WORK, THEY
<br />SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL.
<br />4. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER, INCLUDING AREA FOR
<br />WORK, MATERIALS STORAGE, AND ACCESS TO AND FROM THE WORK, SPECIAL CONDITIONS OR
<br />NOISY WORK, TIMING OF WORK AND INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES.
<br />NOISY OR DISRUPTIVE WORK SHALL BE SCHEDULED AT LEAST ONE (1) WEEK IN ADVANCE OF THE
<br />TIME WORK IS TO COMMENCE.
<br />5. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF
<br />WORKMANSHIP IN GENERAL AND WITH SUCH STANDARDS AS ARE SPECIFIED.
<br />6. CONTRACTOR SHALL ADHERE TO ALL BUILDING STANDARDS. ANY CHANGES TO SAME SHALL BE
<br />SUBMITTED TO ARCHITECT IN WRITING FOR APPROVAL.
<br />7. CONTRACTOR SHALL SUBMIT SAMPLES OF ALL FINISHES OF SUCH SIZE AND NUMBER THAT THEY
<br />REPRESENT REASONABLE DISTRIBUTION OF COLOR RANGES AND PATTERN PRIOR TO
<br />INSTALLATION FOR ARCHITECTS APPROVAL. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND
<br />PRODUCT DATA FOR ARCHITECT'S APPROVAL ON ALL SPECIAL ITEMS REQUIRING CUSTOM
<br />FABRICATION. (SHALL INCLUDE RATED FIRE DOORS AND HARDWARE).
<br />8. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE AND NOTIFY ARCHITECT
<br />OF ANY DISCREPANCIES. CONTRACTOR IS NOT TO SCALE OFF DRAWINGS.
<br />9. CONTRACTOR SHALL PROVIDE 18-GAUGE SHEET METAL BACKING IN PARTITIONS FOR ALL
<br />WALL -MOUNTED FIXTURES AND DEVICES UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
<br />10. ALL FLOORS SHOULD BE LEVEL AND NOT VARY MORE THAN 114" IN 10'4'. THE CONTRACTOR SHALL
<br />NOTIFY ARCHITECT OF ANY CONDITIONS THAT DO NOT MEET THIS STANDARD.
<br />11, ALL MATERIALS INDICATED TO MATCH EXISTING SHALL DO SO WITH RESPECT TO SIZE, SHAPE,
<br />COLOR, TEXTURE, PATTERN, QUALITY AND METHOD OF INSTALLATION INSOFAR AS PRACTICABLE
<br />AND SHALL BE APPROVED BY THE ARCHITECT BEFORE USE.
<br />12. ALL FIREPROOFING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED TO MATCH
<br />ORIGINAL FIRE PROTECTION LEVELS. (OBTAIN REQUIRED APPROVALS AND TESTING).
<br />13. THE FLOORS MAY BE OCCUPIED DURING CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL
<br />PERSONNEL, PASSERSBY OR VISITORS TO THE SITE FROM HARM AND INJURY. BARRIERS SHALL
<br />BE INSTALLED AS REQUIRED TO PROTECT EQUIPMENT INSTALLED DURING CONSTRUCTION.
<br />CAREFULLY MAINTAIN AND PROTECT MONUMENTS, BENCH MARKS AND THEIR REFERENCE POINT
<br />FROM BEING DESTROYED OR DISTURBED; REPLACE AS REQUIRED.
<br />14. EXISTING WORK DAMAGED AS A RESULT OF WORK DONE UNDER THIS CONTRACT SHALL BE
<br />REPAIRED TO ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT FINISHES, SUBJECT TO
<br />ARCHITECT'S APPROVAL, AND AT NO ADDITIONAL COST TO OWNER. ALL REPLACEMENT
<br />MATERIALS REQUIRED TO MATCH EXISTING MATERIALS SHALL DO SO WITH RESPECT TO TYPE,
<br />PATTERN, TEXTURE, SIZE, SHAPE, COLOR AND METHOD OF INSTALLATION INSOFAR AS
<br />PRACTICABLE, AND SHALL BE APPROVED BY THE ARCHITECT AND OWNER PRIOR TO
<br />INSTALLATION.
<br />1& ALL EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT AND SERVICES DISRUPTED OR REMOVED
<br />DURING CONSTRUCTION SHALL BE RESTORED AND REPLACED UNLESS NOTED OTHERWISE.
<br />FIREILIFE SAFETY SYSTEMS TO BE MAINTAINED DURING CONSTRUCTION.
<br />16. INSTALLATION OF MECHANICAL, ELECTRICAL AND STRUCTURAL SYSTEMS WILL REQUIRE OPENING
<br />OF SOME EXISTING WALLS, CEILINGS OR FLOOR CAVITIES. THE CONTRACTOR SHALL BE
<br />RESPONSIBLE FOR THE REPAIR OF THESE OPENINGS TO MATCH EXISTING, EXCEPT WHERE NOTED
<br />OTHERWISE. FILL ALL HOLES AND VOIDS IN FLOORS, WALLS AND CEILINGS WHICH RESULT FROM
<br />INSTALLATION OF WORK, AND REMOVAL OF EXISTING MATERIALS AND EQUIPMENT REQUIRED BY
<br />THIS CONTRACT. PATCHED AREAS SHALL MATCH THE MATERIALS, FINISHES, AND LEVELS
<br />ADJACENT, OR SHALL BE PUT IN THE PROPER CONDITION TO RECEIVE THE FINISH INDICATED.
<br />17, OPENINGS REQUIRED FOR NEW WORK THAT PENETRATES EXISTING STRUCTURE SHALL BE
<br />COORDINATED WITH OWNER PRIOR TO COMMENCING THE WORK. ANY OPENING OVER 2" IN
<br />DIAMETER SHALL BE REVIEWED AND APPROVED BY OWNER. THROUGH CONCRETE SLABS OR
<br />WALLS, OR MASONRY WALLS, ALL ROUND HOLES SHALL BE CORE DRILLED WITH A DIAMOND DRILL
<br />AND ALL RECTANGULAR OPENINGS SHALL BE CUT WITH A DIAMOND SAW. IN NO CASE SHALL ANY
<br />STRUCTURAL MEMBER BE CUT. USE CARBIDE -TIPPED DRILLS FOR GYPSUM WALLBOARD
<br />PARTITIONS. KEEP OVERCUTTING TO A MINIMUM. MAINTAIN CONTINUITY AND INTEGRITY OF FIRE
<br />SEPARATION AT ALL TIMES. GROUT AROUND CONDUITS PASSING THROUGH CONCRETE WALLS
<br />AND FLOORS AND MASONRY WALLS. MAKE PATCHES WITH NEAT, TRIMMED EDGES; MATCH
<br />ADJACENT EXISTING WORK.
<br />18. CONTRACTOR SHALL PROVIDE FLOOR LEVELING AS MAY BE REQUIRED AT SLIDING DOORS,
<br />RELITES WITHOUT BASE, CABINET WORK, AND OTHER LOCATIONS REQUIRING LEVEL SUBSTRATE.
<br />FEATHER CHANGES IN ELEVATION OVER SUFFICIENT AREA TO LIMIT TRANSITION SLOPE TO 1/8'
<br />PER FOOT.
<br />19. MATERIALS, ARTICLES, DEVICES AND PRODUCTS ARE SPECIFIED IN THE DOCUMENTS BY LISTING
<br />ACCEPTABLE MANUFACTURERS OR PRODUCTS, BY REQUIRING COMPLIANCE WITH REFERENCED
<br />STANDARDS, OR BY PERFORMANCE SPECIFICATIONS. FOR ITEMS SPECIFIED BY NAME, SELECT
<br />ANY PRODUCT NAMED. FOR THOSE SPECIFIED BY REFERENCE STANDARDS OR BY PERFORMANCE
<br />SPECIFICATIONS SELECT ANY PRODUCT MEETING OR EXCEEDING SPECIFIED CRITERIA. FOR
<br />APPROVAL OF AN ITEM NOT SPECIFIED, SUBMIT REQUIRED SUBMITTALS, PROVIDING COMPLETE
<br />BACK-UP INFORMATION FOR PURPOSES OF EVALUATION. WHERE BUILDING STANDARD ITEMS ARE
<br />CALLED FOR, NO SUBSTITUTE WILL BE ACCEPTED.
<br />20. CONTRACTOR SHALL PROVIDE FOR ALL WORK REQUIRED TO MAINTAIN COMPLIANCE WITH LOCAL
<br />FIRE CODE. PROVIDE FOR ALL REQUIRED SHOP DRAWINGS AND APPROVALS. CONTRACTOR IS
<br />RESPONSIBLE FOR PROVIDING FIRE ALARM SYSTEM AUDIBILITY.
<br />21. MECHANICAL AND ELECTRICAL FIXTURES, OUTLETS, ETC., WHEN SHOWN ON THE ARCHITECTURAL
<br />DRAWINGS, ARE FOR LOCATION INFORMATION ONLY. MECHANICAL AND ELECTRICAL TO BE
<br />DESIGNED BY OTHERS. ALL CIRCUITING COORDINATION TO BE BY OTHERS.
<br />22. CONTRACTOR IS TO PROVIDE DRAWINGS FOR ARCHITECT'S APPROVAL SHOWING LOCATIONS OF
<br />ALL HVAC THERMOSTATS, GRILLES AND DIFFUSERS, FIRE AND SMOKE DETECTION DEVICES
<br />INCLUDING SPRINKLERS, SMOKE DETECTORS, FIRE EXTINGUISHERS AND HOSE CABINETS,
<br />PLUMBING AND PLUMBING EQUIPMENT.
<br />23. ANY CHANGE IN LIGHT FIXTURE PLACEMENT DUE TO INTERFERENCE OF MECHANICAL OR
<br />STRUCTURAL COMPONENTS MUST BE APPROVED BY THE ARCHITECT.
<br />24. ALL PERMITS INCLUDING FIRE, MECHANICAL, AND ELECTRICAL TO BE FILED SEPARATELY.
<br />2& ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED, SPACKLED AND SANDED SMOOTH WITH NO
<br />VISIBLE JOINTS TO A LEVEL FINISH UNLESS OTHERWISE NOTED. PATCH AND REPAIR SURFACES
<br />TO MATCH ADJACENT OR ADJOINING SURFACES WHERE REQUIRED. ALL SURFACES SHALL BE
<br />ALIGNED.
<br />26. MODIFY EXISTING SUBSTRATE AS REQUIRED TO RECEIVE NEW FLOORING MATERIALS, THUS
<br />PREVENTING NOTICEABLE LUMPS OR DEPRESSIONS.
<br />27. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE.
<br />28. REFER TO MILLWORK SHOP DRAWINGS FOR SPECIFIC DETAILS OF COORDINATION BETWEEN
<br />DRYWALUMILLWORK CONDITIONS.
<br />29. ALL GLASS SHALL BE CLEAR TEMPERED GLASS, UNLESS OTHERWISE NOTED. GLAZING TONG MARKS
<br />SHALL NOT BE VISIBLE. CLEAN AND POLISH ALL GLASS PRIOR TO PROJECT DELIVERY.
<br />30. ALL MILLWORK TO BE FASTENED TO THE PARTITION. PROVIDE NON-COMBUSTIBLE BLOCKING FOR ALL
<br />MILLWORK NOT SUPPORTED BY FLOOR OR ABOVE 4'-0" HT. ALL CONCEALED LUMBER & BLOCKING
<br />TO BE FIRE TREATED.
<br />31. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR: HVAC, CARPET SEAMING, LIGHTING, CASEWORK.
<br />32. MOISTURE TEST- REQUIRED FOR ALL ON GRADE SLAB CONDITIONS DURING THE CONSTRUCTION
<br />ESTIMATING/BUDGETING PROCESS THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />OBTAINING FROM THE BUILDING OWNER DOCUMENTATION AS TO THE VAPOR EMISSIONS RATE
<br />(MOISTURE TEST) FOR ALL "ON GRADE SLAB CONDITIONS". THIS INFORMATION SHOULD THEN BE
<br />IMMEDIATELY SHARED BETWEEN THE ARCHITECT, THE ARCHITECTS' SELECTED FLOORING
<br />REPRESENTATIVE(S), AND FLOORING SUB -CONTRACTOR FOR REVIEW AND APPROVAL OF
<br />APPLICABLE MATERIALS AND ANCILLARY INSTALLATION/FINISH PRODUCTS. IF NO MOISTURE TEST
<br />CAN BE FURNISHED OR IF FINDING ARE IN QUESTION THE GENERAL CONTRACTOR SHALL
<br />PERFORM THE FOLLOWING TESTS:
<br />A. PROVIDE (3) CALCIUM CHLORIDE MOISTURE TESTS FOR THE FIRST THOUSAND SQUARE FEET AND (1)
<br />TEST FOR EVERY ONE THOUSAND SQUARE FEET THEREAFTER AT ALL FLOORS WITHIN SCOPE OF
<br />WORK. THE CALCIUM CHLORIDE TEST SHALL BE CONDUCTED IN ACCORDANCE WITH THE LATEST
<br />EDITION OF ASTM F 1869 °STANDARD TEST METHOD" FOR MEASURING VAPOR EMISSIONS RATE
<br />OF CONCRETE SUN -FLOOR USING ANHYDROUS CALCIUM CHLORIDE. PROVIDE A WRITTEN
<br />REPORT OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE.
<br />B. PROVIDE A PH PENCIL TEST AT ALL FLOORS WITHIN SCOPE OF WORK. PROVIDE A WRITTEN REPORT
<br />OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE.
<br />IF REQUIRED BY THE CALCIUM CHLORIDE TEST, A WATERPROOF MEMBRANE SHALL BE APPLIED TO
<br />ALL FLOORS WITHIN THE SCOPE OF WORK. THE WATERPROOF MEMBRANE(S) SHALL BE
<br />APPROPRIATED FOR EACH FINISH FLOORING APPLICATION AS SPECIFIED BY THE SPECIFIC
<br />FLOORING MANUFACTURER VIA THE ARCHITECT. A LICENSED INSTALLER SHALL BE UTILIZED FOR
<br />INSTALLATION/APPLICATION OF EACH SPECIFIC MEMBRANE (AS APPLICABLE TO THE FINISH
<br />FLOORING PRODUCT) AND A WRITTEN WARRANTY SHALL BE PROVIDED DOCUMENTING STRICT
<br />CONFORMANCE TO THE SPECIFIED MANUFACTURES INSTALLATION REQUIREMENTS TO ENSURE
<br />AND UPHOLD ALL PERFORMANCE AND LIFE CYCLE GUARANTEES.
<br />33. CONCRETE SLAB ON GRADE REPAIR- MINOR SCOPE (100 SQUARE FEET OR LESS)
<br />WHERE CONCRETE SLAB ON GRADE INFILL AND TRENCHING MUST OCCUR; CONDUCT THE
<br />APPROPRIATE UNDER SLAB INVESTIGATION (VIA SONG -GRAPH AND/OR X-RAY) TO LOCATE
<br />EXISTING UTILITIES OR OTHER OBSTRUCTIONS THAT SHOULD NOT BE DAMAGED. SAW CUT SLAB
<br />AT SUBJECT AREAS) AND PULL BACK THE EXISTING VAPOR BARRIER (IF PRESENT) AND PROTECT
<br />FOR FUTURE RE -INSTALLATION. EXECUTE THE NECESSARY UNDER SLAB WORK (INCLUDING
<br />EXCAVATION), BACKFILL AND RE -COMPACT THE SUBJECT AREA WITH THE PREVIOUSLY HELD
<br />MATERIALS (IF THE EXCAVATED MATERIALS ARE NOT SUITABLE FOR RE -INSTALLATION, DISCARD
<br />AND PROVIDE NEW FREE DRAINING GRANULAR MATERIAL). RE -COMPACT FILL SOIL TO AT LEAST
<br />95%OF THE MAXIMUM DRY DENSITY (MOD) OBTAINED IN GENERAL ACCORDANCE WITH THE ASTM D
<br />1557 TEST PROCEDURE. RE -INSTALL THE EXISTING VAPOR BARRIER AND BIND SEAMS WITH
<br />MINIMUM 3" WIDE PRESSURE SENSITIVE TAPE TO ENSURE AN AIR/MOISTURE RESISTANT
<br />BOND. ATTACH NEW INFILL TO EXISTING CONCRETE SLAB WITH 18 INCH LONG #4 REBARAT 24
<br />INCHES ON CENTER EMBEDDED 8INCHES INTO THE EXISTING CONCRETE SLAB WITH HILTI
<br />HIT-HY-200 ADHESIVE (OR SIMPSON SET ADHESIVE). REINFORCEMENT SHALL BE INSTALLED PER
<br />ADHESIVE MANUFACTURER'S RECOMMENDATIONS. PROVIDE W2 X W2 X 6 X 6 WELDED WIRE
<br />FABRIC WITHIN SUBJECT AREA(S), INFILL SLAB TO MATCH THICKNESS OF ADJACENT SURFACE(S)
<br />(BUT NOT BE LESS THAN FOUR INCHES THICK) AND #4 DOWELS SHALL BE CENTERED IN SLAB. THE
<br />CONCRETE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3000 PSI WITH A
<br />MAXIMUM WATER CEMENT RATION OF 0.58 AND IS TO BE PLACED LEVEL WITH ADJACENT
<br />SURFACES. LET CURE AND PROVIDE MOISTURE TESTING AS SPECIFIED ABOVE.
<br />IF SCOPE OF WORK INCLUDES STRUCTURAL ELEVATED SLABS CONSULT STRUCTURAL
<br />ENGINEER. REFER TO STRUCTURAL PLANS, IF APPLICABLE, FOR ADDITIONAL SPECIFICATIONS AND
<br />REQUIREMENTS.
<br />34. CLEAN, REPAIR ANY EXISTING PERIMETER BLINDS AS REQUIRED TO BE IN A FULLY FUNCTIONING &
<br />OPERATIONAL MANNER.
<br />35. COORDINATE WITH SUB -CONTRACTORS THE LOCATIONS OF ELECTRICAL AND VOICE/DATA OUTLETS,
<br />PLUMBING AND OTHER DEVICES WITH LAYOUT AND DESIGN OF CUSTOM CASEWORK.
<br />36. CASEWORK SHALL CONFORM TO A.W.I. CURRENT STANDARDS.
<br />37. EGRESS LIGHTING SHALL BE DESIGNED BY A LICENSED ELECTRICAL ENGINEER BASED ON FINAL
<br />FLOOR PLAN(S) AND THE MOST CURRENT (IN FORCE) ISSUE OF THE IBC, IEC AND LOCAL
<br />CODES/ORDINANCES. THE ENGINEER MAY USE THE ARCHITECTS EGRESS MAPS (COMMON PATH
<br />OF TRAVEUEXIT TRAVEL DISTANCE) AS STARTING POINT FORA BASIS OF DESIGN. HOWEVER, IT
<br />SHALL REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER TO COMPLETE A SCOPE OF WORK
<br />THAT ADDRESSES ALL EGRESS LIGHTING I.E.; ROOMS, SPECIALIZED SPACES, PATHWAYS, ETC. PER
<br />THE AFOREMENTIONED CODES. FINAL EGRESS LIGHTING QUANTITIES AND LOCATIONS SHALL BE
<br />DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT DETERMINATION.
<br />2306 I
<br />ROOM NUMBER REFERENCE
<br />I-f0.3
<br />e
<br />DETAIL REFERENCE BUBBLE
<br />2aoe
<br />DOOR NUMBER REFERENCE.
<br />0
<br />REVISION REFERENCE
<br />,
<br />JOB NORTH
<br />F1aa
<br />INTERIOR ELEVATION SYMBOL
<br />©
<br />REFERENCE KEY
<br />(REFER TO SHEET/KEY NOTES)
<br />U
<br />W
<br />2
<br />U
<br />Q
<br />V
<br />CL
<br />O
<br />N
<br />N
<br />In
<br />LLI
<br />Z
<br />O
<br />7 00
<br />N P
<br />Q j
<br />L >
<br />ZAP ENERGY
<br />Opus Seaway
<br />Floor 1 & 2
<br />2300 Merrill Creek Pkwy
<br />Everett, WA
<br />DESIGN JPC
<br />DRAWN NB/AG
<br />CHECKED TP
<br />NO. 22-0799
<br />SPACE PLAN
<br />02-01-2023 SCHEMATIC DESIGN
<br />GENERAL NOTES &
<br />SYMBOLS
<br />1-0.1
<br />2018.JPCARCHITECTB.LLC
<br />
|