Laserfiche WebLink
,TI O <br />GENERAL NOTES: <br />9 <br />REFLECTED CEILING NOTES: <br />1. COORDINATE THE WORK OF ALL TRADES INVOLVED IN THE CEILING <br />WORK TO ENSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING <br />SUSPENSION SYSTEM, ETC., NECESSARY TO MAINTAIN THE FINISHED <br />CEILING HEIGHTS INDICATED ON ARCHITECTS DRAWINGS. <br />2. PERIMETER CEILING ANGLE, WHERE OCCURS, SHALL BE INSTALLED TIGHT <br />TO VERTICAL SURFACES, FREE FROM CURVES, BREAKS OR OTHER <br />IRREGULARITIES AND PAINTED TO MATCH CEILING FINISH. <br />3. FURNISH AND INSTALL ALL ASSOCIATED TRIM AND SEISMIC BRACING AS <br />REQUIRED. <br />4. LIGHT FIXTURES, NEW SPRINKLERS AND OTHER CEILING ELEMENTS <br />SHALL BE CENTERED IN THE 2'X2' SECTION OF INDIVIDUAL CEILING TILES <br />U.N.O. (EXIST. SPRINKLERS TO REMAIN UNLESS CONFLICT WITH NEW <br />ELEMENTS). <br />5. PROVIDE CEILING ACCESS AS REQUIRED FOR EQUIPMENT AND SYSTEM <br />MAINTENANCE, AND MATCH ADJACENT CEILING FINISH U.N.O. <br />6. ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF <br />FINISHED FLOOR TO BOTTOM OF FINISHED GYPSUM BOARD OR CEILING <br />TILE AND SHALL ALLOW FOR THICKNESS OF ALL FLOOR FINISHES. <br />7. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING <br />HEIGHTS, LIGHT TYPES, LIGHT FIXTURES, AND ASSOCIATED ITEMS. <br />8. ALL SPECIFIC INFORMATION CONCERNING INSTALLATION FOR VARIOUS <br />ABOVE -CEILING ELEMENTS ARE TO BE DESIGN BUILD, DOCUMENTATION <br />BY OTHERS - PERMITTED SEPARATELY. <br />9. NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS <br />WITH MAIN RUNNERS, DUCTS, STRUCTURES, HVAC, AND/OR (E)CONDUIT, <br />PRIOR TO FRAMING FOR LIGHTS. ANY DISCREPANCIES BETWEEN <br />ARCHITECT'S CEILING GRID LOCATION& ACTUAL FIELD CONDITIONS ARE <br />TO BE CLARIFIED WITH THE ARCHITECT PRIOR TO FRAMING. <br />10. SUBMIT GRILLE, THERMOSTAT, AND OTHER FIXTURE AND ELEMENT <br />LAYOUTS TO THE ARCHITECT FOR REVIEW AT LEAST 2 WEEKS PRIOR TO <br />INSTALLATION. <br />11. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING, <br />MECHANICAL DUCTS, STRUCTURAL ELEMENTS AND ALL OTHER RELATED <br />ITEMS. INSTALL NEW PLUMBING, MECHANICAL, FANS, DUCTS, CONDUITS, <br />AND OTHER RELATED ITEMS SO AS TO NOT CONFLICT WITH ANY/ALL FIELD <br />CONDITIONS INCLUDING LUMINAIRES. <br />12. INSTALL NEW LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR COVER <br />OVER LOUVER, LENS, BAFFLE, ETC. TO AVOID FIXTURE SOILING OR <br />DAMAGE. FIXTURES SHALL BE MAINTAINED CLEAN AND AS NEW. ALL <br />LAMPS SHALL BE NEW AT PROJECT COMPLETION-RELAMP EXISTING <br />FIXTURES. <br />13. CONTRACTOR TO VERIFY CODE COMPLIANCE OF EXISTING ACOUSTICAL <br />CEILING GRID SYSTEMS AND ASSOCIATED SEISMIC BRACING RESTRAINTS. <br />SYSTEMS FOUND NOT IN COMPLIANCE SHALL BE MODIFIED ANDIOR NEW <br />PROVIDED AS REQUIRED BY CURRENT BUILDING CODES (INCLUDING, BUT <br />NOT LIMITED TO; CURRENT IBC WALL MOLDING (2" ANGLE) AND SEISMIC <br />SEPARATION JOINTS). <br />14, CONTRACTOR TO VERIFY CODE COMPLIANCE OF ALL EXISTING LIGHTING <br />FIXTURES AND ASSOCIATED SEISMIC BRACING RESTRAINTS. FIXTURES <br />FOUND NOT IN COMPLIANCE SHALL BE MODIFIED AND/OR NEW PROVIDED <br />AS REQUIRED BY CURRENT BUILDING AND/OR ENERGY COMPLIANCE <br />CODES. <br />15. ALL EXITING LIGHTS AND EGRESS LIGHTING LOCATIONS SHALL BE <br />DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT <br />DETERMINATION. <br />16. ALL SMOKE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH IMC/IBC <br />OR SUPERCEDING CODE. ALL FIRE DAMPERS SHALL BE INSTALLED IN <br />ACCORDANCE WITH IMC/IBC OR SUPERCEDING CODE. <br />DEMOLITION NOTES: <br />1. OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS OF SAME IN <br />CONTRACT PRICE. <br />2. FURNISH ALL LABOR AND MATERIALSIEQUIPMENT TO COMPLETE <br />DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED. <br />3. CONTRACTOR SHALL KEEP CONSTRUCTION AREA FREE OF DUST AND <br />DEBRIS FOR THE DURATION OF CONSTRUCTION. <br />4. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY <br />THE POINT IN QUESTION WITH THE ARCHITECT BEFORE PROCEEDING. <br />5. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) <br />SHALL BE LEFT IN "BROOM CLEAN" CONDITION. ALL DEBRIS AND <br />MISCELLANEOUS MATERIAL SHALL BE REMOVED. <br />6. ALL DEBRIS REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH <br />BUILDING MANAGEMENT REQUIREMENTS AND PROCEDURES. <br />7. AS DIRECTED BY BUILDING MANAGEMENT, ALL DOORS, FRAMES, <br />HARDWARE, MECHANICAL ITEMS, PLUMBING FIXTURES, LIGHT FIXTURES <br />(INCLUDING DOWNLIGHTS AND FLUORESCENTS), AND SPECIAL EQUIPMENT <br />SHOWN TO BE REMOVED, SHALL BE CLEAN AND FREE OF DEFECTS, <br />PROTECTED, SAVED AND REUSED AS DIRECTED HEREIN, OR RETURNED TO <br />BUILDING STOCK. <br />8. IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL OUTLETS, <br />SWITCHES, WIRES, THERMOSTATS, ETC., TO THEIR SOURCE. <br />9. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING <br />ANY DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS TO EXISTING <br />CONSTRUCTION IN ELEVATOR LOBBY, PUBLIC CORRIDORS, RESTROOMS <br />OR TENANT SPACES. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR <br />AS NOTED HEREIN. <br />10. NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM <br />BOX OR SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING SHALL BE <br />DAMAGED DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION. <br />RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND <br />FIRE ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL <br />BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS. NO ACTIVE <br />SMOKE DETECTOR SHALL BE COVERED OR OTHERWISE REMOVED OR <br />USED FOR OTHER THAN ITS INTENDED PURPOSE. <br />11. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT <br />PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE <br />VERIFIED WITH TELEPHONE COMPANIES AND TENANT. <br />12. REMOVE ALL EXISTING MATERIALS WHICH WOULD CAUSE RISES OR <br />DEPRESSIONS IN NEW FLOORING SURFACE, SUCH AS FASTENERS, OUTLET <br />CORES, COVER PLATES, RESILIENT FLOOR COVERINGS, CARPET, CARPET <br />PAD, FLASH PATCH, CONCRETE FILL, PLYWOOD, ETC. <br />13. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON <br />DRAWINGS. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF <br />DEMOLITION REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH <br />THE CONTRACT DRAWINGS. <br />14. RATED WALLS SHALL NOT BE PENETRATED UNLESS THE RATING IS <br />MAINTAINED. <br />15. DISPOSAL: ALL DEBRIS REMOVED FROM THE SITE SHALL BE RECYCLED AS <br />MUCH AS PRACTICAL AND ALLOWED BY LAW. <br />A/C AIRCONDITIONING <br />ACT ACOUSTICAL CEILING TILE <br />AFF ABOVE FINISH FLOOR <br />AHJ AUTHORITIES HAVING JURISDICTION <br />ALT. ALTERNATE <br />APPROX. APPROXIMATE <br />BD BOARD <br />BLDG BUILDING <br />BLK BLOCK <br />BLKG BLOCKING <br />BOT BO OM <br />BIS BUILDING STANDARD <br />BU BUILT UP <br />CAB CABINET <br />CLG CEILING <br />CLR CLEAR(ANCE) <br />COL COLUMN <br />CONC CONCRETE <br />CONS CONSTRUCTION <br />CONT CONTINUOUS <br />CORR CORRIDOR <br />CPT CARPET <br />CT CERAMICTILE <br />CTR CENTER <br />DEMO DEMOLITION <br />DTL DETAIL <br />OF D INKING FOUNTAIN <br />DIA DIAMETER <br />DIM DIMENSION <br />ON DOWN <br />DR DOOR <br />DWG DRAWING <br />DRW DRAWER <br />E EAST <br />EA EACH <br />EL ELEVATION <br />ELEC ELECTRICAL <br />ELEV ELEVATOR <br />EQ EQUAL <br />EQUIP EQUIPMENT <br />EST ESTIMATE <br />EXIST EXISTING <br />EXP EXPANSION <br />FEC <br />FIREEXTINGUISHERCABINET <br />FF <br />FACTORYFINISH <br />FH <br />FULL HEIGHT <br />FIN <br />FINISH(ED) <br />FUR <br />FLOOR <br />FLUOR <br />FLUORESCENT <br />FDIC <br />FURNISH BY OWNER, <br />INSTALL BY CONTRACTOR <br />FOS <br />FACE OF STUD(S) <br />FOC <br />FACE OF CONCRETE <br />FOF <br />FACE OF FINISH <br />FT <br />FUR <br />FOOTIFEET <br />FURREDIFURRING <br />GA GAUGE <br />GC GENERA -CONTRACTOR <br />GL GLASS/GLAZING <br />GM GYPSUM WALL BOARD <br />HC HOLLOWCORE <br />HCPD HANDICAPPED <br />HDR HEADER <br />HOW R HARDWARE <br />HM HOLLOWMETAL <br />HORIZ HORIZONTAL <br />HR HOUR <br />HT HEIGHT <br />HVAC HEATING VENTILATING <br />AIR CONDITIONING <br />1 `u�YN�19.Y1JJ1[L <br />JAN JANITOR <br />JT JOINT <br />KIT KITCHEN <br />LAM LAMINATE(D) <br />LAV LAVATORY <br />LH LEFT HAND <br />MAX MAXIMUM <br />MECH MECHANICAL <br />NIL METAL <br />MEZ MEZZANINE <br />MFR MANUFACTURE(R) <br />MIN MINIMUM <br />MISC MISCELLANEOUS <br />MTD MOUNTED <br />MUL MULLION <br />N NORTH <br />NIC NOT IN CONTRACT <br />NTS NOT TO SCALE <br />CA OVERALL <br />OC ON CENTER <br />OD OUTSIDE DIAMETER <br />OH OPPOSITE HAND <br />OPNG OPENING <br />P-LAM PLASTIC LAMINATE <br />PNL PANEL <br />PR PAIR <br />PTN PARTITION <br />PAD RADIUS <br />RB RESILIENT BASE <br />FIT RESILIENTTILE <br />REF REFERENCE <br />REFR REFRIGERATOR <br />REINF REINFORCING <br />REQ REQUIRED <br />REV REVISION <br />FIN RIGHT HAND <br />RM ROOM <br />RO ROUGH OPENING <br />S SOUTH <br />SC SOLID CORE <br />SEAL SEALANT <br />SECT SECTION <br />BHT SHEET <br />SIM SIMILAR <br />SPEC SPECIFICATION <br />SQ SOLARE <br />SS STAINLESS STEEL <br />STL STEEL <br />STOR STORAGE <br />STIR C STRUCTURAL <br />SUSP SUSPENDED <br />TEL TELEPHONE <br />TEMP TEMPERED <br />TFTI TENANT FURNISHED <br />& TENANT INSTALLED <br />THK THICK(NESS) <br />THRESH THRESHOLD <br />TV TELEVISION <br />TYP TYPICAL <br />UNFIN UNFINISHED <br />UNO UNLESS NOTED OTHERWISE <br />VCT VINYL COMPOSITION TILE <br />VEN VENEER <br />VERT VERTICAL <br />VESTI VESTIBULE <br />VFY VERIFY <br />VWC VINYL WALL COVERING <br />W WESTANIDE <br />wl WITH <br />WD WOOD <br />W/o WITHOUT <br />WR WEIGHT <br />1. REFER TO BASIC BUILDING SPECIFICATIONS, REQUIREMENTS AND STANDARDS FOR EXISTING <br />SHELL AND CORE CONSTRUCTION. ALL WORK IS TO BE COMPATIBLE WITH EXISTING <br />CONSTRUCTION. <br />2. ALL WORK SHALL CONFORM TO APPLICABLE CURRENT FEDERAL, STATE AND LOCAL CODES. THE <br />CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATION OF AND COORDINATION WITH <br />CITY AND STATE AGENCIES, AND PROVIDE REQUIRED PERMITS. ALL TESTS AND INSPECTIONS <br />ASSOCIATED WITH OBTAINING APPROVALS TO PROCEED WITH AND COMPLETE THE WORK SHALL <br />BE PAID FOR BY THE CONTRACTOR. <br />3. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS, <br />EQUIPMENT AND TRANSPORTATION NECESSARY OR REASONABLY INFERABLE AS BEING <br />NECESSARY FOR THE EXECUTION OF THE WORK. BY SUBMITTING A PROPOSAL, THE CONTRACTOR <br />REPRESENTS THAT THOROUGH EXAMINATION OF THE SITE AND ALL EXISTING CONDITIONS AND <br />LIMITATIONS HAVE BEEN MADE AND THAT THE CONTRACT DOCUMENTS HAVE BEEN EXAMINED IN <br />COMPLETE DETAIL, AND THAT IT IS DETERMINED BEYOND DOUBT THAT THE DRAWINGS, <br />SPECIFICATIONS AND EXISTING CONDITIONS ARE SUFFICIENT, ADEQUATE AND SATISFACTORY FOR <br />CONSTRUCTION OF THE WORK. WHERE MINOR ADJUSTMENTS TO THE WORK ARE NECESSARY <br />FOR THE PURPOSES OF FABRICATION AND INSTALLATION OF ITEMS, OR RESOLUTIONS OF <br />CONFLICTS BETWEEN ITEMS, WITHIN THE INTENT OF THE CONTRACT DOCUMENTS, THE <br />CONTRACTOR SHALL MAKE SUCH ADJUSTMENTS AT NO ADDED EXPENSE TO THE OWNER. WHERE <br />SUCH MINOR ADJUSTMENTS AFFECT FUNCTIONAL OR AESTHETIC DESIGN OF THE WORK, THEY <br />SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL. <br />4. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER, INCLUDING AREA FOR <br />WORK, MATERIALS STORAGE, AND ACCESS TO AND FROM THE WORK, SPECIAL CONDITIONS OR <br />NOISY WORK, TIMING OF WORK AND INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES. <br />NOISY OR DISRUPTIVE WORK SHALL BE SCHEDULED AT LEAST ONE (1) WEEK IN ADVANCE OF THE <br />TIME WORK IS TO COMMENCE. <br />5. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF <br />WORKMANSHIP IN GENERAL AND WITH SUCH STANDARDS AS ARE SPECIFIED. <br />6. CONTRACTOR SHALL ADHERE TO ALL BUILDING STANDARDS. ANY CHANGES TO SAME SHALL BE <br />SUBMITTED TO ARCHITECT IN WRITING FOR APPROVAL. <br />7. CONTRACTOR SHALL SUBMIT SAMPLES OF ALL FINISHES OF SUCH SIZE AND NUMBER THAT THEY <br />REPRESENT REASONABLE DISTRIBUTION OF COLOR RANGES AND PATTERN PRIOR TO <br />INSTALLATION FOR ARCHITECTS APPROVAL. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND <br />PRODUCT DATA FOR ARCHITECT'S APPROVAL ON ALL SPECIAL ITEMS REQUIRING CUSTOM <br />FABRICATION. (SHALL INCLUDE RATED FIRE DOORS AND HARDWARE). <br />8. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE AND NOTIFY ARCHITECT <br />OF ANY DISCREPANCIES. CONTRACTOR IS NOT TO SCALE OFF DRAWINGS. <br />9. CONTRACTOR SHALL PROVIDE 18-GAUGE SHEET METAL BACKING IN PARTITIONS FOR ALL <br />WALL -MOUNTED FIXTURES AND DEVICES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. <br />10. ALL FLOORS SHOULD BE LEVEL AND NOT VARY MORE THAN 114" IN 10'4'. THE CONTRACTOR SHALL <br />NOTIFY ARCHITECT OF ANY CONDITIONS THAT DO NOT MEET THIS STANDARD. <br />11, ALL MATERIALS INDICATED TO MATCH EXISTING SHALL DO SO WITH RESPECT TO SIZE, SHAPE, <br />COLOR, TEXTURE, PATTERN, QUALITY AND METHOD OF INSTALLATION INSOFAR AS PRACTICABLE <br />AND SHALL BE APPROVED BY THE ARCHITECT BEFORE USE. <br />12. ALL FIREPROOFING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED TO MATCH <br />ORIGINAL FIRE PROTECTION LEVELS. (OBTAIN REQUIRED APPROVALS AND TESTING). <br />13. THE FLOORS MAY BE OCCUPIED DURING CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL <br />PERSONNEL, PASSERSBY OR VISITORS TO THE SITE FROM HARM AND INJURY. BARRIERS SHALL <br />BE INSTALLED AS REQUIRED TO PROTECT EQUIPMENT INSTALLED DURING CONSTRUCTION. <br />CAREFULLY MAINTAIN AND PROTECT MONUMENTS, BENCH MARKS AND THEIR REFERENCE POINT <br />FROM BEING DESTROYED OR DISTURBED; REPLACE AS REQUIRED. <br />14. EXISTING WORK DAMAGED AS A RESULT OF WORK DONE UNDER THIS CONTRACT SHALL BE <br />REPAIRED TO ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT FINISHES, SUBJECT TO <br />ARCHITECT'S APPROVAL, AND AT NO ADDITIONAL COST TO OWNER. ALL REPLACEMENT <br />MATERIALS REQUIRED TO MATCH EXISTING MATERIALS SHALL DO SO WITH RESPECT TO TYPE, <br />PATTERN, TEXTURE, SIZE, SHAPE, COLOR AND METHOD OF INSTALLATION INSOFAR AS <br />PRACTICABLE, AND SHALL BE APPROVED BY THE ARCHITECT AND OWNER PRIOR TO <br />INSTALLATION. <br />1& ALL EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT AND SERVICES DISRUPTED OR REMOVED <br />DURING CONSTRUCTION SHALL BE RESTORED AND REPLACED UNLESS NOTED OTHERWISE. <br />FIREILIFE SAFETY SYSTEMS TO BE MAINTAINED DURING CONSTRUCTION. <br />16. INSTALLATION OF MECHANICAL, ELECTRICAL AND STRUCTURAL SYSTEMS WILL REQUIRE OPENING <br />OF SOME EXISTING WALLS, CEILINGS OR FLOOR CAVITIES. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR THE REPAIR OF THESE OPENINGS TO MATCH EXISTING, EXCEPT WHERE NOTED <br />OTHERWISE. FILL ALL HOLES AND VOIDS IN FLOORS, WALLS AND CEILINGS WHICH RESULT FROM <br />INSTALLATION OF WORK, AND REMOVAL OF EXISTING MATERIALS AND EQUIPMENT REQUIRED BY <br />THIS CONTRACT. PATCHED AREAS SHALL MATCH THE MATERIALS, FINISHES, AND LEVELS <br />ADJACENT, OR SHALL BE PUT IN THE PROPER CONDITION TO RECEIVE THE FINISH INDICATED. <br />17, OPENINGS REQUIRED FOR NEW WORK THAT PENETRATES EXISTING STRUCTURE SHALL BE <br />COORDINATED WITH OWNER PRIOR TO COMMENCING THE WORK. ANY OPENING OVER 2" IN <br />DIAMETER SHALL BE REVIEWED AND APPROVED BY OWNER. THROUGH CONCRETE SLABS OR <br />WALLS, OR MASONRY WALLS, ALL ROUND HOLES SHALL BE CORE DRILLED WITH A DIAMOND DRILL <br />AND ALL RECTANGULAR OPENINGS SHALL BE CUT WITH A DIAMOND SAW. IN NO CASE SHALL ANY <br />STRUCTURAL MEMBER BE CUT. USE CARBIDE -TIPPED DRILLS FOR GYPSUM WALLBOARD <br />PARTITIONS. KEEP OVERCUTTING TO A MINIMUM. MAINTAIN CONTINUITY AND INTEGRITY OF FIRE <br />SEPARATION AT ALL TIMES. GROUT AROUND CONDUITS PASSING THROUGH CONCRETE WALLS <br />AND FLOORS AND MASONRY WALLS. MAKE PATCHES WITH NEAT, TRIMMED EDGES; MATCH <br />ADJACENT EXISTING WORK. <br />18. CONTRACTOR SHALL PROVIDE FLOOR LEVELING AS MAY BE REQUIRED AT SLIDING DOORS, <br />RELITES WITHOUT BASE, CABINET WORK, AND OTHER LOCATIONS REQUIRING LEVEL SUBSTRATE. <br />FEATHER CHANGES IN ELEVATION OVER SUFFICIENT AREA TO LIMIT TRANSITION SLOPE TO 1/8' <br />PER FOOT. <br />19. MATERIALS, ARTICLES, DEVICES AND PRODUCTS ARE SPECIFIED IN THE DOCUMENTS BY LISTING <br />ACCEPTABLE MANUFACTURERS OR PRODUCTS, BY REQUIRING COMPLIANCE WITH REFERENCED <br />STANDARDS, OR BY PERFORMANCE SPECIFICATIONS. FOR ITEMS SPECIFIED BY NAME, SELECT <br />ANY PRODUCT NAMED. FOR THOSE SPECIFIED BY REFERENCE STANDARDS OR BY PERFORMANCE <br />SPECIFICATIONS SELECT ANY PRODUCT MEETING OR EXCEEDING SPECIFIED CRITERIA. FOR <br />APPROVAL OF AN ITEM NOT SPECIFIED, SUBMIT REQUIRED SUBMITTALS, PROVIDING COMPLETE <br />BACK-UP INFORMATION FOR PURPOSES OF EVALUATION. WHERE BUILDING STANDARD ITEMS ARE <br />CALLED FOR, NO SUBSTITUTE WILL BE ACCEPTED. <br />20. CONTRACTOR SHALL PROVIDE FOR ALL WORK REQUIRED TO MAINTAIN COMPLIANCE WITH LOCAL <br />FIRE CODE. PROVIDE FOR ALL REQUIRED SHOP DRAWINGS AND APPROVALS. CONTRACTOR IS <br />RESPONSIBLE FOR PROVIDING FIRE ALARM SYSTEM AUDIBILITY. <br />21. MECHANICAL AND ELECTRICAL FIXTURES, OUTLETS, ETC., WHEN SHOWN ON THE ARCHITECTURAL <br />DRAWINGS, ARE FOR LOCATION INFORMATION ONLY. MECHANICAL AND ELECTRICAL TO BE <br />DESIGNED BY OTHERS. ALL CIRCUITING COORDINATION TO BE BY OTHERS. <br />22. CONTRACTOR IS TO PROVIDE DRAWINGS FOR ARCHITECT'S APPROVAL SHOWING LOCATIONS OF <br />ALL HVAC THERMOSTATS, GRILLES AND DIFFUSERS, FIRE AND SMOKE DETECTION DEVICES <br />INCLUDING SPRINKLERS, SMOKE DETECTORS, FIRE EXTINGUISHERS AND HOSE CABINETS, <br />PLUMBING AND PLUMBING EQUIPMENT. <br />23. ANY CHANGE IN LIGHT FIXTURE PLACEMENT DUE TO INTERFERENCE OF MECHANICAL OR <br />STRUCTURAL COMPONENTS MUST BE APPROVED BY THE ARCHITECT. <br />24. ALL PERMITS INCLUDING FIRE, MECHANICAL, AND ELECTRICAL TO BE FILED SEPARATELY. <br />2& ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED, SPACKLED AND SANDED SMOOTH WITH NO <br />VISIBLE JOINTS TO A LEVEL FINISH UNLESS OTHERWISE NOTED. PATCH AND REPAIR SURFACES <br />TO MATCH ADJACENT OR ADJOINING SURFACES WHERE REQUIRED. ALL SURFACES SHALL BE <br />ALIGNED. <br />26. MODIFY EXISTING SUBSTRATE AS REQUIRED TO RECEIVE NEW FLOORING MATERIALS, THUS <br />PREVENTING NOTICEABLE LUMPS OR DEPRESSIONS. <br />27. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE. <br />28. REFER TO MILLWORK SHOP DRAWINGS FOR SPECIFIC DETAILS OF COORDINATION BETWEEN <br />DRYWALUMILLWORK CONDITIONS. <br />29. ALL GLASS SHALL BE CLEAR TEMPERED GLASS, UNLESS OTHERWISE NOTED. GLAZING TONG MARKS <br />SHALL NOT BE VISIBLE. CLEAN AND POLISH ALL GLASS PRIOR TO PROJECT DELIVERY. <br />30. ALL MILLWORK TO BE FASTENED TO THE PARTITION. PROVIDE NON-COMBUSTIBLE BLOCKING FOR ALL <br />MILLWORK NOT SUPPORTED BY FLOOR OR ABOVE 4'-0" HT. ALL CONCEALED LUMBER & BLOCKING <br />TO BE FIRE TREATED. <br />31. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR: HVAC, CARPET SEAMING, LIGHTING, CASEWORK. <br />32. MOISTURE TEST- REQUIRED FOR ALL ON GRADE SLAB CONDITIONS DURING THE CONSTRUCTION <br />ESTIMATING/BUDGETING PROCESS THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />OBTAINING FROM THE BUILDING OWNER DOCUMENTATION AS TO THE VAPOR EMISSIONS RATE <br />(MOISTURE TEST) FOR ALL "ON GRADE SLAB CONDITIONS". THIS INFORMATION SHOULD THEN BE <br />IMMEDIATELY SHARED BETWEEN THE ARCHITECT, THE ARCHITECTS' SELECTED FLOORING <br />REPRESENTATIVE(S), AND FLOORING SUB -CONTRACTOR FOR REVIEW AND APPROVAL OF <br />APPLICABLE MATERIALS AND ANCILLARY INSTALLATION/FINISH PRODUCTS. IF NO MOISTURE TEST <br />CAN BE FURNISHED OR IF FINDING ARE IN QUESTION THE GENERAL CONTRACTOR SHALL <br />PERFORM THE FOLLOWING TESTS: <br />A. PROVIDE (3) CALCIUM CHLORIDE MOISTURE TESTS FOR THE FIRST THOUSAND SQUARE FEET AND (1) <br />TEST FOR EVERY ONE THOUSAND SQUARE FEET THEREAFTER AT ALL FLOORS WITHIN SCOPE OF <br />WORK. THE CALCIUM CHLORIDE TEST SHALL BE CONDUCTED IN ACCORDANCE WITH THE LATEST <br />EDITION OF ASTM F 1869 °STANDARD TEST METHOD" FOR MEASURING VAPOR EMISSIONS RATE <br />OF CONCRETE SUN -FLOOR USING ANHYDROUS CALCIUM CHLORIDE. PROVIDE A WRITTEN <br />REPORT OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE. <br />B. PROVIDE A PH PENCIL TEST AT ALL FLOORS WITHIN SCOPE OF WORK. PROVIDE A WRITTEN REPORT <br />OF FINDINGS TO THE ARCHITECT AS NOTED ABOVE. <br />IF REQUIRED BY THE CALCIUM CHLORIDE TEST, A WATERPROOF MEMBRANE SHALL BE APPLIED TO <br />ALL FLOORS WITHIN THE SCOPE OF WORK. THE WATERPROOF MEMBRANE(S) SHALL BE <br />APPROPRIATED FOR EACH FINISH FLOORING APPLICATION AS SPECIFIED BY THE SPECIFIC <br />FLOORING MANUFACTURER VIA THE ARCHITECT. A LICENSED INSTALLER SHALL BE UTILIZED FOR <br />INSTALLATION/APPLICATION OF EACH SPECIFIC MEMBRANE (AS APPLICABLE TO THE FINISH <br />FLOORING PRODUCT) AND A WRITTEN WARRANTY SHALL BE PROVIDED DOCUMENTING STRICT <br />CONFORMANCE TO THE SPECIFIED MANUFACTURES INSTALLATION REQUIREMENTS TO ENSURE <br />AND UPHOLD ALL PERFORMANCE AND LIFE CYCLE GUARANTEES. <br />33. CONCRETE SLAB ON GRADE REPAIR- MINOR SCOPE (100 SQUARE FEET OR LESS) <br />WHERE CONCRETE SLAB ON GRADE INFILL AND TRENCHING MUST OCCUR; CONDUCT THE <br />APPROPRIATE UNDER SLAB INVESTIGATION (VIA SONG -GRAPH AND/OR X-RAY) TO LOCATE <br />EXISTING UTILITIES OR OTHER OBSTRUCTIONS THAT SHOULD NOT BE DAMAGED. SAW CUT SLAB <br />AT SUBJECT AREAS) AND PULL BACK THE EXISTING VAPOR BARRIER (IF PRESENT) AND PROTECT <br />FOR FUTURE RE -INSTALLATION. EXECUTE THE NECESSARY UNDER SLAB WORK (INCLUDING <br />EXCAVATION), BACKFILL AND RE -COMPACT THE SUBJECT AREA WITH THE PREVIOUSLY HELD <br />MATERIALS (IF THE EXCAVATED MATERIALS ARE NOT SUITABLE FOR RE -INSTALLATION, DISCARD <br />AND PROVIDE NEW FREE DRAINING GRANULAR MATERIAL). RE -COMPACT FILL SOIL TO AT LEAST <br />95%OF THE MAXIMUM DRY DENSITY (MOD) OBTAINED IN GENERAL ACCORDANCE WITH THE ASTM D <br />1557 TEST PROCEDURE. RE -INSTALL THE EXISTING VAPOR BARRIER AND BIND SEAMS WITH <br />MINIMUM 3" WIDE PRESSURE SENSITIVE TAPE TO ENSURE AN AIR/MOISTURE RESISTANT <br />BOND. ATTACH NEW INFILL TO EXISTING CONCRETE SLAB WITH 18 INCH LONG #4 REBARAT 24 <br />INCHES ON CENTER EMBEDDED 8INCHES INTO THE EXISTING CONCRETE SLAB WITH HILTI <br />HIT-HY-200 ADHESIVE (OR SIMPSON SET ADHESIVE). REINFORCEMENT SHALL BE INSTALLED PER <br />ADHESIVE MANUFACTURER'S RECOMMENDATIONS. PROVIDE W2 X W2 X 6 X 6 WELDED WIRE <br />FABRIC WITHIN SUBJECT AREA(S), INFILL SLAB TO MATCH THICKNESS OF ADJACENT SURFACE(S) <br />(BUT NOT BE LESS THAN FOUR INCHES THICK) AND #4 DOWELS SHALL BE CENTERED IN SLAB. THE <br />CONCRETE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3000 PSI WITH A <br />MAXIMUM WATER CEMENT RATION OF 0.58 AND IS TO BE PLACED LEVEL WITH ADJACENT <br />SURFACES. LET CURE AND PROVIDE MOISTURE TESTING AS SPECIFIED ABOVE. <br />IF SCOPE OF WORK INCLUDES STRUCTURAL ELEVATED SLABS CONSULT STRUCTURAL <br />ENGINEER. REFER TO STRUCTURAL PLANS, IF APPLICABLE, FOR ADDITIONAL SPECIFICATIONS AND <br />REQUIREMENTS. <br />34. CLEAN, REPAIR ANY EXISTING PERIMETER BLINDS AS REQUIRED TO BE IN A FULLY FUNCTIONING & <br />OPERATIONAL MANNER. <br />35. COORDINATE WITH SUB -CONTRACTORS THE LOCATIONS OF ELECTRICAL AND VOICE/DATA OUTLETS, <br />PLUMBING AND OTHER DEVICES WITH LAYOUT AND DESIGN OF CUSTOM CASEWORK. <br />36. CASEWORK SHALL CONFORM TO A.W.I. CURRENT STANDARDS. <br />37. EGRESS LIGHTING SHALL BE DESIGNED BY A LICENSED ELECTRICAL ENGINEER BASED ON FINAL <br />FLOOR PLAN(S) AND THE MOST CURRENT (IN FORCE) ISSUE OF THE IBC, IEC AND LOCAL <br />CODES/ORDINANCES. THE ENGINEER MAY USE THE ARCHITECTS EGRESS MAPS (COMMON PATH <br />OF TRAVEUEXIT TRAVEL DISTANCE) AS STARTING POINT FORA BASIS OF DESIGN. HOWEVER, IT <br />SHALL REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER TO COMPLETE A SCOPE OF WORK <br />THAT ADDRESSES ALL EGRESS LIGHTING I.E.; ROOMS, SPECIALIZED SPACES, PATHWAYS, ETC. PER <br />THE AFOREMENTIONED CODES. FINAL EGRESS LIGHTING QUANTITIES AND LOCATIONS SHALL BE <br />DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT DETERMINATION. <br />2306 I <br />ROOM NUMBER REFERENCE <br />I-f0.3 <br />e <br />DETAIL REFERENCE BUBBLE <br />2aoe <br />DOOR NUMBER REFERENCE. <br />0 <br />REVISION REFERENCE <br />, <br />JOB NORTH <br />F1aa <br />INTERIOR ELEVATION SYMBOL <br />© <br />REFERENCE KEY <br />(REFER TO SHEET/KEY NOTES) <br />U <br />W <br />2 <br />U <br />Q <br />V <br />CL <br />O <br />N <br />N <br />In <br />LLI <br />Z <br />O <br />7 00 <br />N P <br />Q j <br />L > <br />ZAP ENERGY <br />Opus Seaway <br />Floor 1 & 2 <br />2300 Merrill Creek Pkwy <br />Everett, WA <br />DESIGN JPC <br />DRAWN NB/AG <br />CHECKED TP <br />NO. 22-0799 <br />SPACE PLAN <br />02-01-2023 SCHEMATIC DESIGN <br />GENERAL NOTES & <br />SYMBOLS <br />1-0.1 <br />2018.JPCARCHITECTB.LLC <br />