Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through this project's Public Works <br />Reviewer Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />Plans <br />— <br />It appears that with the addition of the walkway and enclosing the <br />area below the deck the project will now have a net new <br />impervious surface area exceeding 200SF. Projects with 200SF <br />or more of new impervious surface in the combined <br />stormwater/sewer area are required to meet the Flow Control <br />Performance Standard outlined in the City of Everett Design and <br />Construction Standards and Specifications Chapter 6-10. 1 have <br />included the section as an attachment to the correction email. <br />Please provide a drainage report and revised plans outlining how <br />this project will meet the Flow Control Performance Standard for <br />the new impervious surface area. <br />2 <br />Plans <br />- <br />Please call out the dimensions and total area for the new <br />walkway. Provide a table showing the proposed impervious <br />surface area (walkway and new roof/enclosed area under deck) <br />Page 2 of 2 <br />