Laserfiche WebLink
2501 Colby Ave- B2205-067 <br /> Description of the installation of the roof <br /> 1. Install 1/2-inch CDX plywood <br /> 2. Build up edges 4 112-inches around the enitre <br /> building. <br /> 3. Install 112-inch taper insulation to keep water inside the roof around the enitre <br /> building. <br /> 4. Install 114-inch densdeck <br /> 5. Install 60mil TPO with screws and plates. <br /> 6. Install plumbing stack boots coated with TPO. <br /> 7. Install new scuppers <br /> 8. Install new fascia cap metal. <br /> 9. Complete clean up and haul away of all debris including magnetic roller to pick up <br /> nails. <br /> No,this will not increase the weight of the roof structure. <br /> The plywood will be installed 1 W staples every 4". <br /> Insulation will be installed by a 3'd party in the attic space. <br />