My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2501 COLBY AVE 2023-10-20
>
Address Records
>
COLBY AVE
>
2501
>
2501 COLBY AVE 2023-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 3:38:12 PM
Creation date
8/30/2023 8:18:38 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2501
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> RCW 64.55 : MULTI-FAMILY, MIXED-USE, AND TOWNHOME <br /> BUILDING ENCLOSURE SUBMITTAL CHECKLIST <br /> EXEMPT BUILDINGS: Non-residential buildings,hotels,motels,dormitories, care facilities,floating homes, mixed- <br /> use buildings with maximum of two residential attached dwelling units,duplexes,and townhouses(as defined by <br /> the IRC)where each unit is on a single platted lot(recorded zero lot line subdivisions). <br /> NOTE: The City of Everett will not review or approve plans or inspect the work required by RCW <br /> 64.55, but will collect the required submittals per RCW 64.55.020(1)and(2). <br /> PERMIT SUBMITTAL AND CERTIFICATE OF OCCUPANCY SUBMITTAL REQUIREMENTS: <br /> ❑ Signed Permit Application(s) (1 Copy, as applicable) Building Permit Application <br /> ❑ For multi-building apartment complexes,we will require one application per building <br /> ❑ Construction Plans(2 sets; 1/4"= 1' minimum scale. If in historical overlay, 3 sets <br /> required. 24"06" maximum sheet size,stapled bound edge, 5/8"thick, all pages <br /> uniformly sized,each page consecutively numbered) <br /> ❑ Completed RCW 64.55 Worksheet(see below) per building(with one of the following <br /> options checked): <br /> ❑ Valuation is 5%or less of the assessed value of the market improvement.—Show <br /> the calculations for the valuation of the work, and the percentage of the assessed <br /> value. <br /> ❑ Two complete sets of building enclosure details which meet WA State RCW 64.55. <br /> —independent inspection required during construction with letter of certification. <br /> ❑ Certified record copy of the"Sale Prohibition Covenant" RCW 64.55.010 (6) (a) <br /> (vi). <br /> ❑ Single platted lot per townhouse, documented by recorded approved site plans <br /> per RCW 64.55.010(6) (b) (iii).This must be submitted prior to obtaining a <br /> Certificate of Occupancy. <br /> ❑ Note:The worksheet item selected must be submitted prior to obtaining a building <br /> permit. <br /> ❑ Permit Submittal Fee(Plan check fee) <br /> F;CbY 69.t�. t�tiec',lrst!2R?•�1 Page?of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.