My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2939 COLBY AVE EVERETT MUSEUM 2023-09-26
>
Address Records
>
COLBY AVE
>
2939
>
EVERETT MUSEUM
>
2939 COLBY AVE EVERETT MUSEUM 2023-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 9:09:57 AM
Creation date
8/30/2023 9:42:34 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2939
Tenant Name
EVERETT MUSEUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/1/2022 Page 1 <br /> City of Everett <br /> 6:43:41AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1812-145 Site Address 2939 COLBY AVE <br /> Applied 12/27/2018 Applicant Lot <br /> Approved 12/27/2018 Owner EVERETT MUSEUM OF HISTORY Block <br /> Issued 12/27/2018 Contractor D K SYSTEMS INC(ELEC) Tract <br /> Parent Permit No. B1807-010 Description INSTALL(7)LOW VOLT T-STATS <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 8/20/2019 8/20/2019 PERMIT TKJ APPROVAL <br /> EXTENSION <br /> 2/6/2020 2/6/2020 PERMIT WRL APPROVAL RAN OUT OF TIME <br /> EXTENSION <br /> 8/27/2020 8/27/2020 PERMIT KLC APPROVAL <br /> EXTENSION <br /> 2/3/2021 2/3/2021 PERMIT KLC EXTENSIONA COVID <br /> EXTENSION EXTENSION <br /> 7/7/2021 7/7/2021 PERMIT KLC EXTENSIONA COVID <br /> EXTENSION EXTENSION <br /> 2/28/2022 2/28/2022 ELEC 09-FINAL SKB APPRVD-PERK As noted. 2/22/2022 10:08 AM D K SYSTEMS INC <br /> (ELEC) <br /> Final Inspection. AM Please. May also call <br /> Dulce at 360-755-1555. Thank you. <br /> Contact Name:John Bateman <br /> Site Address:2939 COLBY AVE <br /> Phone:3607705409 <br /> e-Mail:dulce@dksystemsinc.com <br /> (2/28/2022 10:34 AM SKB) <br /> Stat wire snaked down walls ran through <br /> ceiling and up to the rooftop following <br /> ductwork.This is phase 1 basement only. <br /> 2/28/2022 2/28/2022 ELEC 07-TGRID SKB APPROVAL (2/28/2022 10:34 AM SKB) <br /> Phase 1 basement only. <br /> INSPl2 CRIiVSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.