My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 BROADWAY CM HEATING 2023-09-25
>
Address Records
>
BROADWAY
>
1415
>
CM HEATING
>
1415 BROADWAY CM HEATING 2023-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2023 11:55:31 AM
Creation date
9/7/2023 8:52:39 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1415
Tenant Name
CM HEATING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> Geotechnical Engineering Evaluation NGA File No.1213420 <br /> CM Heating Additions January 8,2021 <br /> Everett,Washington Page 6 <br /> significant surface water flow is encountered during construction, this flow should be diverted around <br /> areas to be developed,and the exposed subgrades should be maintained in a semi-dry condition. <br /> If wet conditions are encountered, alternative site grading techniques might be necessary. These could <br /> include using large excavators equipped with wide tracks and a smooth bucket to complete site grading, <br /> and covering exposed subgrade with a layer of crushed rock for protection. If wet conditions are <br /> encountered or construction is attempted in wet weather, the subgrade should not be compacted, as <br /> this could cause further subgrade disturbance. In wet conditions, it may be necessary to cover the <br /> exposed subgrade with a layer of crushed rock as soon as it is exposed to protect the moisture sensitive <br /> soils from disturbance by machine or foot traffic during construction. The prepared subgrade should be <br /> protected from construction traffic and surface water should be diverted around areas of prepared <br /> subgrade. <br /> Temporary and Permanent Slopes <br /> Temporary cut slope stability is a function of many factors, including the type and consistency of soils, <br /> depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open,and the <br /> presence of surface or groundwater. It is exceedingly difficult under these variable conditions to <br /> estimate a stable,temporary,cut slope angle.Therefore, it should be the responsibility of the contractor <br /> to maintain safe slope configurations at all times as indicated in OSHA guidelines for cut slopes. <br /> The following information is provided solely for the benefit of the owner and other design consultants <br /> and should not be construed to imply that Nelson Geotechnical Associates, Inc. assumes responsibility <br /> for job site safety.Job site safety is the sole responsibility of the project contractor. <br /> For planning purposes,we recommend that temporary cuts be no steeper than 2 Horizontal to 1 Vertical <br /> (2H:1V). If significant groundwater seepage or surface water flow were encountered, we would expect <br /> that flatter inclinations would be necessary. We recommend that cut slopes be protected from erosion. <br /> The slope protection measures may include covering cut slopes with plastic sheeting and diverting <br /> surface runoff away from the top of cut slopes. We do not recommend vertical slopes for cuts deeper <br /> than four feet, if worker access is necessary. We recommend that cut slope heights and inclinations <br /> conform to appropriate OSHA/WISHA regulations. <br /> Permanent cut and fill slopes should be no steeper than 2H:1V. However, flatter inclinations may be <br /> required in areas where loose soils are encountered. Permanent slopes should be vegetated and the <br /> vegetative cover maintained until established. <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br /> 61 1 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.