My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 BROADWAY CM HEATING 2023-09-25
>
Address Records
>
BROADWAY
>
1415
>
CM HEATING
>
1415 BROADWAY CM HEATING 2023-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2023 11:55:31 AM
Creation date
9/7/2023 8:52:39 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1415
Tenant Name
CM HEATING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC •ORKS PERMIT OateApplied: 5/6/2021 <br /> City of Everett Permit Services Public orks Permit#: PW2105-013 <br /> EVERETT 3200 Cedar Street, 2nd0 Floor Associated Bldg Permit#: B2105-012 <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $5,717.45 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> GARNER KATHLEEN D TRUST Jeff Stavert <br /> 23009 60TH AVE W 2812 Colby Ave <br /> MOUNTLAKE TERRACE,WA, Everett,WA,98201 <br /> PHONE: PHONE:4252522153 <br /> TAX PARCEL ID#:00475428700700 SITE ADDRESS: 1415 BROADWAY AVE <br /> DESCRIPTION:SITEWORK FOR NEW OFFICE/WAREHOUSE BLDG <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT A TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Co ruction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TO FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved b e City of Eve -tt Public Works Department dated 11/13/2021. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City lin P r itting :.rtal at pw.everettwa.gov to formally request all required <br /> inspections.A handout is provided at permit issuance with instructions n o t que an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb,roadway,etc.)sha b ace. per City Standards and/or as directed by the City PW Inspector. <br /> 7.City of Everett Water Department crews shall make all connections Ci ater ain at owner/contractor's expense.This work to be under a <br /> separate Utility Permit to be purchased at the Permit Services Cou to era os estimate by the Water Department.Work shall be scheduled 3-4 <br /> weeks in advance. <br /> 8.As-builts of storm,sanitary sewer,and water systems will b it d to .e submitted to the PW Inspector per City Design and Construction <br /> Standards and Specifications for Development prior to final ap o I/clo:e out of the permit. <br /> 11.A 2-year Warranty Bond in the amount of 10%of the c tr ction osts for all Stormwater Infrastructure shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 12.A Landscape Inspection is required by the Planning ep - t prior to final by the Public Works Inspector.To schedule a planning inspection, <br /> contact Planning@everettwa.gov and request an inspec ' w' the permit number,site address,and inspection type listed.Please allow up to one <br /> week for the inspection to be scheduled. <br /> 13.Prior to any interruption to the public right-of-way(r.:dways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained from the <br /> City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be submitted for the <br /> area of requested closure.Please allow 1-2 weeks f. TSU permit issuance from the date of application. <br /> 14.Submit Drainage Covenant to allow for inspec 'on of stormwater facilities prior to project close-out. <br /> 15.This permit must be finaled in order to clos: out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW <br /> 25-Site Final/Permit Close Out within the On' e Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Ei <br /> Public Works Permit Fee Breakdown: suErosion Control $200.00 <br /> Grade/Fill/Excavate(650CY) $170.00 <br /> Paving(8,784SF) $45.00 <br /> PW Plan Review $996.54 NOV 2 9 2021 <br /> PW Site Inspection $1,993.08 <br /> Stormwater System Deve .pment Fee $2,312.83 CITY OF EVERETT <br /> City of Everett Official Use Only PAtnrndagtrdigl@NT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further/r /3 �� <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> APPLICANT/JOB SITE COPY TREASURERDDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.