Laserfiche WebLink
roads clean of sediment and keep street wash water separate from entering storm drains <br /> until treatment can be provided. <br /> Element #8—Stabilize Channels and Outlets <br /> N/A <br /> Element#9—Control Pollutants <br /> BMPs C151, C152,C153, and C154 will be used to control pollutants. All <br /> pollutants, including waste materials and demolition debris,that occur onsite shall <br /> be handled and disposed of in a manner that does not cause contamination of <br /> stormwater. Good housekeeping and preventative measures will be taken to ensure <br /> that the site will be kept clean, well-organized, and free of debris. <br /> Element #10—Control Dewatering <br /> There will be no dewatering expected as part of this proposal. If it occurs, Baker tanks will <br /> be used for dewatering. <br /> Element #11—Maintain BMPs <br /> BMPs C 150, C 160,and C 162 shall be used to manage the project. <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and <br /> repaired as needed to assure continued performance of their intended function. <br /> Maintenance and repair shall be conducted in accordance with each particular BMP's <br /> specifications. Visual monitoring of the BMPs will be conducted at least once every <br /> calendar week and within 24 hours of any rainfall event that causes a discharge from the <br /> site. If the site becomes inactive, and is temporarily stabilized,the inspection frequency <br /> will be reduced to once every month. All temporary erosion and sediment control BMPs <br /> shall be removed within 30 days after the final site stabilization is achieved or after the <br /> temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized <br /> on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently <br /> stabilized. <br /> Element#12—Manage the Proiect <br /> BMPs C150, C160, and C162 shall be used to manage the project. Erosion and sediment <br /> control BMPs for this project have been designed based on the following principles: Design <br /> the project to fit the existing topography, soils, and drainage patterns; Emphasize erosion <br /> control rather than sediment control;Minimize the extent and duration of the area exposed; <br /> Keep runoff velocities low; Retain sediment on site; Thoroughly monitor site and maintain <br /> all ESC measures and Schedule major earthwork during the dry season. The SWPPP shall <br /> be modified as necessary to include additional or modified BMPs designed to correct <br /> problems identified. Revisions to the SWPPP shall be completed within seven (7) days <br /> following the inspection. <br /> Insight Engineering Co. -Stormwater Site Plan 3/25/2021 <br /> - 18- <br />