Laserfiche WebLink
B. PRE-DEVELOPED HYDROLOGY <br /> The site is currently developed with a home, a commercial building, and parking lot. The <br /> site contains one drainage basin that slopes to the slightly to the west. There are no critical <br /> areas located within the site. Per NRCS survey of Snohomish County, the project site <br /> contains Alderwood soils that have a hydrologic classification of Type "C". <br /> Insight Engineering Co. -Stormwater Site Plan 3/25/2021 <br /> -26- <br />